TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

High Precision Seamless Steel Pipe E355 Hydraulic Cylinder EN10305-1 E355 E235

Price Negotiable
Price: Negotiated
MOQ: 1 Ton
Delivery Time: 25-35 Days
Brand: TORICH
Product Description

High Precision Seamless Steel Pipe E355 Hydraulic Cylinder EN10305-1 E355 E235

 

1.Basic information of precision seamless steel pipe:

Standard:EN10305-1,DIN2391

Type: Seamless Cold-Drawn

Application:honed steel tubes , oil cylinder, motorcycle, auto industry,etc

Section Shape: Round

Technique: Cold Drawn

Material: E235,E355,E215

OD: 5-420 mm

WT: 0.5-50 mm

Length: Max 12000mm

Additional Info:

Packaging: Anti rust, woven bags with two slings

Transportation: Ocean,Land,Air

Certificate: ISO9001,ISO14001,TS16949

Port: Shanghai,Ningbo

2.Production process:

Raw material---inspection chemical analysis,physical performance, sizes---cutting---chamfer grinding(deburring)---pickling---saponification-cold drawn/cold rolled---straightening---cleaning(oil removal)---eddy current testing---bright heat treatmeny(NBK)---straightening---dimensional accuracy and surface testing---eddy current testing---physical performance---surface treatment, galvanized, army green passivated---cleaning and packing

3.Chemical analysis of precision seamless steel pipe:

Steel Tube C Si Mn P S Al
E215 0.1 0.05 0.7 0.025 0.025 0.025
E235 0.17 0.35 1.2 0.025 0.025 -
E355 0.22 0.55 1.6 0.025 0.025 -

4.Main feature of our EN10305-1 precision seamless steel pipe:

high precision

excellent surface

No scale, no debris

Plain end

Inside surface cleaning

good straightness

black phosphating

 

5.Delivery condition:

BK (+C) Cold finished/hard (cold finished as drawn) No heat treatment after the last cold forming process.
BKW (+LC) Cold finished/soft (lightly cold worked)

After the last heat treatment there is a light finishing pass (cold drawing).

 

BKS (+SR) Cold finished/stress relieve annealed. After the final cold forming process the tubes are stress relieve annealed.
GBK (+A) Annealed After the final cold forming process the tubes are annealed in a controlled atmosphere
NBK (+N) Normalized. (Mainly focus on) After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

6.Precision seamless steel pipe product show:

Precision Seamless Steel PipePrecision Seamless Steel Pipe

7.Packing method

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.