TORICH INTERNATIONAL LIMITED
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

CK45 Shock Absorber ISO9001 BKS Honed Steel Tube Seamless

Price Negotiable
Price: Negotiable
MOQ: 5Tons
Delivery Time: 30-45 work days
Brand: TORICH
Product Description

TORICH Seamless Pipe CK45 Shock Absorber ISO9001 BKS Honed Steel Tube

ST52 E355 BKS Shock Absorber Using CK45 AISI1020 AISI1045 CDS Honed Tube

Material:
Carbon Steel Tube
Outer Diameter:
30-250mm
Wall Thickness:
2-30mm
Material Grade:
ST52,E355,CK45,A106,A53,SKTM11A,STKM13A,STKM13C,S45C,and so on
Delivery Condition:
BK/BKS/GBK/NBK
Delivery time:
within 20-30 days after receiving prpayment
Trade Terms:
any other China main port

 

Manufacture Method:

Cold drawn, hot rolled+deep hole bored


Certification:

ISO9001, SGS,

 

Standard&Grade:

DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.

 

ID Tolerance:

ISO H8

 

End finish:

Plain ends with square cuts,free of burrs

 

Bore Roughness:

Ra0.30um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes
 

End finish:
Plain ends with square cuts,free of burrs

 

Usage:
Hydraulic cylinder, Pneumatic Cylinder

 

Product Feature:

1.High precision (can cut the costs of machining) .
2.Excellent surface finish
3.Good mechanical performance (Aneal ,Bright Anealing,QT heatment on steel tubes to reach customers' Mechanical requsts. )

 

1.+C /BK

No heat treatment after final cold drawing process.

 

2.+LC/BKW

After the final heat treatment there's a suitable drawing pass.

 

3.+SA/BKS

After the final cold drawing process there's a stress relief heat treatment in controlled atmosphere.

 

4.+A/GBK

After the cold drawing process the tubes are annealed in a controlled atmosphere.

 

5.+N/NBK

After the final cold drawing operation the tubes are normalized in a controlled atmosphere

 

Application:
Our Certifications:
 

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TORICH INTERNATIONAL LIMITED
Location Suite 1604-3, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Contact Person Richard SHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.