Automatic Paper Cup Forming Machine , Ice Cream / Coffee Paper Cup Making Plant

Price Negotiable
Price: negotiation
MOQ: 1 set paper cup machine
Delivery Time: 35-45 working days after confirmed cup size and received deposit
Brand: Shunda
Product Description

Automatic Paper Cup Forming Machine , Ice Cream / Coffee Paper Cup Making Plant

 

Description:

 

SMD-90 paper cup machine has the Cup main body shaping mechanism, the bottom forming, the glass

forming mechanism, transmission mechanism and electric control parts. Bowl on the forming mechanism

with pieces of paper, paper transfer device,ultrasonic suture device; Bottom forming mechanism by the

end of paper,photoelectric feeding mechanism, strong bottom forming, flip the bottom of the transmission

mechanism, two groups of heating mechanism, folding mechanism, knurling, transition cups of institutions,

the main turret institutions and die; The glass forming mechanism of volume mouth turret, cans, and

silicone oil mechanism, two groups of warp, the cup body; Electric control system adopts imported

mitsubishi PLC programmable controller,photoelectric tracking system, touch screen man-machine

interface,convenient operation safety.

 

 

Automatic Paper Cup Forming Machine , Ice Cream / Coffee Paper Cup Making Plant

 

Specifications:

 

MODEL 

                    SMD-90

SPEED

                    100-120PCS/MIN

CUP SIZE RANGE

            Top Diameter: 60MM(Min)- 115 MM(Max)

            Bottom Diameter: 40MM(Min)-85MM(Max)

            Height: 50MM(Min)-180MM(Max)

MATERIAL

                    135-450GRAM

CONFIGURATION

                    ULTRASONIC&HOT AIR

OUTPUT

                    12KW,380V/220V,60HZ/50HZ

AIR COMPRESSOR 

                    0.5 M³/Min

NET WEIGHT

                    3.4 TONS

MACHINE SIZE

                    2500  ×1800 ×1700 MM

COUNTER SIZE

                    900 ×900 ×1760 MM 

 

 

 

Whole Process

 

 

 

Applications:

 

Produce for Coffee Cup, Tea Cup, Juice Cup, Ice Cream Cup etc

 

 

 

After Service

 

1. warranty:3 years

 

2. the guide booklet will be sent with machine to guide the installation process works,adjust the whole

machine,production,avoide or solve the problem which the buyer will face.

 

3. we will adjust the machine well for one week before the delivery,ensure the machine has the perfect

performance.

 

4. we can dispatch technologists to buyer's factory,guiding installation,ajustment for a period,the buyer

incharge of the salary,traffic fee,boarding and lodging,communication and Daily salary.

 

5. we supply the free training of buyer,the training won't stop until the buyer control the whole leson!the

cost of air ticket,boarding and lodging should provided by buyer.

 

6. we supply the consumable spare parts for free  for 3 year use.

 

 

Maintaince Notice

 

1. Don't be in an environment of corrosive gas or smoke
2. Don't in the product may be splashed water, oil or use chemicals.
3. Please with stable voltage source power supply
4. make sure the power cord in good condition, so as not to cause fire or shock damage.
5. Instrument after electrify please don't touch input and output terminals, lest cause electric shock or

instrument malfunction.
6. if you open the instrument shell, there may be a shock hazard.Because of power, has its internal

capacitance charging, can keep certain voltage.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company HAINING CHENGDA MACHINERY CO.LTD
Location No.50,Jingbian 10th Road,Haining city ,Zhejiang province,China
Contact Person Chengxian Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.