Double Wall Paper Cup Machine,ripple double wall paper cup sleeving machine
Double Wall Paper Cup Machine,ripple doublw wall paper cup sleeving machine
Alibaba al por mayor Double layer Cup Machine
Oil lubrication system:
Adoptes forced lubrication system to ensure main driving oil supply regularly
and reduce friction and prolong the machine life. The oil circuit adds a clear the oil and filtering system
to clean the oil automaticly. Our factory is the first one to using double layer plate to avoid the scraps
of paper into the machine's inside.
![]()
Parameters:
| MODEL | SMD-80A |
| Speed | 90-100 PCS/MIN |
| Cup size Range | 6-22oz |
| Paper request Gram | 135-450GSM(single and double PE coated paper) |
| Heating system | ULTRASONIC&HOT AIR |
| Output | 380V/220V,50/60HZ, 10 KW Three Phase four wire |
| Air compressor | 0.5 M³/Min |
| Net weight | 3 TONS |
| Machinery Size | 2500 ×1800 ×1700 MM |
| Counter Size | 900 ×900 ×1760 MM |
Finished Paper Cups:

About Us
As the sole professional manufacturer on the paper cup machine,our factory established in 1999,located in Haining City, Zhejiang Province. We have rich experience on the paper cup machine& paper cups making ,providing high-quality, comprehensive and advanced technical products to our customers all over the word. In our factory there is...
READ MORE →1. 18 years experience in the paper cup machine field.
2. Attend at least 3 machine fairs (in Beijing,Wuhan,Yiwu)to meet you.
3. Accept OEM and ODM services
1. Is you company a factory or trading compay?
---Our company is a factory, also have export license.
2. Where is your factory loated? How can I visit there?
---Our factory is located in Haining City, Zhejiang Province, China, about 1.5 hours by car from Shanghai. All our clients from home or abroad are warmly welcome to visit our company !
3. How does your factory do regarding quality control?
---Quality is priority. Shunda people always attach great importance to quality controlling from the very beginning to the very end:
1).All raw material we used are environmental-friendly;2).Skilful workers care every details in handling the producing and packing processes;
3).Quality Control Department specially responsible for quality checking in each process.
4. Will you teach how to use the machine?
---Yes, engineers available to service machinery overseas or learn in our factory.
5. How about the shipment?
---Normally 30-40 days after confirming order, detail delivery date should be decided according to
production season and order quantity.
6. What about the shipment? (---T/T or L/C)
7. Do you have warranty?
---1 year for electronic parts from shipment date, 3 years for mechenical parts from shipment date
8. Do you have OEM/ODM services?
---Yes, OEM/ODM service are available here. We can make some changes on machine according to your requirements.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.









