60 Pcs / Min Automatic Paper Cup Lid Forming Machine PLC Control High Speed
60pcs/min High Speed Automatic Paper Cup Lid Forming Machine PLC Control
Product Description
| MODEL | PLM-60 |
| Speed | 50-60 pcs/min |
| Lid size | Diameter(A): 60mm-125mm Height(H):12-25mm |
| Material | Single and Double PE coated paper |
| Paper request Gram | 135-450GSM(single and double PE coated paper) |
| Heating system | Hot air and electric heating |
| Output | 380V/220V 5.5KW,50HZ, Three Phase four wire |
| Air compressor | 1.2 M³/Min |
| Net weight | 2 TONS |
| Machinery Size | 1700 ×1300 ×1500 MM |
Finished products(Paper Lids only, customized):
Detailed picture show:
Lid Body Sealing
Name: Ultrasonic
Brand: EVERGREEN/Rongzhen
Original: Taiwan/CN
Features:
Ultrasonic sealing for lid body, both okay for single or double pe coated paper.

Gear Drive System
Features:
1. Make running more stable
2. High Precision
Oil Lubrication System
Features:
1. automatic spray engine oil to gears, chains
2. less human maintaince
3. oil can be recyced used
4. clean and change oil half a year
PLC control Panel
Simple and efficient control panel, mady by MITSUBISHI
make work more intelligent.
----Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
----After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
Packaging&Delivery
Machine: Seaworthy and suitable for bumpy roads. Strong wooden box and firm plate
Spare Parts: Deliver by Express, DHL, Fedex, UPS...
Delivery time: It depends on actual production plan
1. 1. Is your company a factory or trading company?
---Our company is a factory, also have export license.---Our factory is located in haining City, Zhejiang Province, China, about 1.5 hours by car from Shanghai .All our clients, from home or abroad, are warmly welcome to visit our company !
---Quality is priority. Shunda people always attach great importance to quality controlling from the very beginning to the very end:
1).All raw material we used are environmental-friendly;
2).Skilful workers care every details in handling the producing and packing processes;
3).Quality Control Department specially responsible for quality checking in each process.
---Yes, engineers available to service machinery overseas or learn in our factory.
---Normally 30-40 days after confirming order, detail delivery date should be decided according to production season and order quantity.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




