Electrical Equipment & Supplies Batteries Nickel Cadmium Batteries (NiCd)

C-22 DN10 - DN1200 UNS N06022 Ni-Cr-Mo Alloy Hastelloy Pipe Polishing Surface Treatment

Price Negotiable
Price: Negotation
MOQ: 10 Kilogram/Kilograms
Delivery Time: 7~30days
Brand: TOBO
Product Description
Product Category

PRODUCT CATEGORIES

 
 
hastelloy welded round pipewww.buttweldingfitting.com
 
Product Description

DN10-DN1200 UNS N06022 Ni-Cr-Mo Alloy Hastelloy C-22 Pipes

 

Brand Name

TOBO

Product Name

Hastelloy Alloy Pipe

Certification

SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED

Place of Origin

Shanghai China (Mainland)

Outer Diameter

DN10-DN1200,3/8"-100",6-2500mm

Wall Thickness

SCH5-SCH160,XS,STD,XXS,0.5-150mm

Length

5.8m,6m,11.8m,12m,or as required 

 

 

 

 

 

 

 

 

 

 

 

Material

Duplex: 2205(UNS S31803/S32205),2507(UNS S32750),UNS S32760,2304,LDX2101,LDX2404,LDX4404,904L;

Alloy : Alloy 20,Alloy 28,Alloy 31;
Hastelloy: Hastelloy B / B-2,Hastelloy B-3,Hatelloy C22,Hastelloy C-4,Hastelloy S,
Hastelloy C276,Hastelloy C-2000,Hastelloy G-35,Hastelloy G-30,Hastelloy X, Hastelloy N;
Haynes: Haynes 230,Haynes 556,Haynes 188;
Inconel: Inconel 600,Inconel 601,Inconel 602CA,Inconel 617,Inconel 625,Inconel 718,Inconel X-750;Carpenter 20;
Incoloy: Incoloy 800 / 800H / 800HT,Incoloy 825,Incoloy 925,Incoloy 926
GH: GH2132,GH3030,GH3039,GH3128,GH4180,GH3044
Monel: Monel 400,Monel K500
Nitronic: Nitronic 40,Nitronic 50,Nitronic 60;
Nimonic: Nimonic 75,Nimonic 80A,Nimonic 90 ;

Others: 254SMo,253Ma,F15,Invar36,1J22,N4,N6 etc
1.4057,1.4313,1.4362,1.4372,1.4378,1.4418,1.4482,1.4597,1.4615,1.4662,1.4669,
1.4913,1.4923 etc

Standard

ASTM B 366, ASTM B 446, NACE MR 0175, ISO 15156,ISO6207, API 6A

Finish

 Annealed & pickled, bright annealing, polished

Ends

 Beveled or plain end, square cut, burr free ,Plastic Cap at Both end

 

 

 

 

Application

Petroleum/Power/Chemical/Construction/GaS/Metallurgy/Shipbuilding etc

Minimum Order Quantity

1kg

Price

Depending on quantity

Payment Terms

T/T or Western Union or LC

Supply Ability

3,0000pcs per month

Delivery Time

10-50 days depending on quantity 

 

Packaging Details

Bare packing/bundle packing with woven bag/wooden or steel frame crate packing/plastic cap protection at the both sides of tubes and suitably protected for sea-worthly delivery or as requested.

Surface

pickled surface ,polish

Special design available as the requirement of customer

 

 

 
 
 

hastelloy welded round pipehastelloy welded round pipe7.jpg

 
 
Company Information
hastelloy welded round pipe

ABOUT US

 We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.

VIEW MORE>>
Product testing
hastelloy welded round pipe
 
Certification

hastelloy welded round pipe

Our Advantages
hastelloy welded round pipe

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1.  Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 

4. Could you please tell us the month capacity of your products ?

 

A: It depends on which model, we produce more than 2500 tons rubber materials per month.

 

 
Packaging&Shipping

Package:Ply-wooden case or plate

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

hastelloy welded round pipe

Contact us

hastelloy welded round pipe

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TOBO STEEL GROUP CHINA
Location 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
Contact Person Joy Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.