Tianjin Mikim Technique co.,Ltd.
                                                                                                           
Verified Supplier
26 Years
Since 2000
Menu
Machinery Food & Beverage Machinery Pet Food Processing Machines

Pet treats/Dog chews food Auto Meat Strips Dog Treats Processing Line

Price Negotiable
Price: USD
MOQ: 1 sets
Delivery Time: 45 working days after receiving the down payment
Brand: Mikim
Product Description

Dog Food Jerky Treats Making Machine

 

Dog Food Jerky Treats Making Machine

MK-126 meat strip extruding machine can extrude multi pieces of meat sticks. Different sizes and shapes can be made by changing the mold.

 

1. Especially used to produce high content (max 70-80%) meat products.

2. Patented design to produce meat strips with different shapes and sizes.

3. Stainless steel control cabinet, touch screen with a friendly interface, and fault display function.

4. The screw adopts a detachable structure and has a rust-proof treatment.

 

Conveyor Part

1. The conveyor is used to transport meat strips. In addition, the cutting device is mounted on this conveyor belt.

2. The conveying speed can be adjusted to meet various speeds.

3. Stainless steel meets food-grade materials, including mesh belts.

4. The upper layer is used to transport materials and cut materials. The lower layer is used to transport the tray.

 

 

Dog Food Jerky Treats Making Machine

 

Technical Parameters

 

Output Power Required Worker Voltage / Frequency Dimension
300-500kg/hr 12kw 2~3 380V / 50Hz 15 x 6 x 3m
 

Dog Food Jerky Treats Making Machine

Commissioning Service

1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.

2. After delivering machines to the client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.

3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.

4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.

5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion of commissioning service.

6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Tianjin Mikim Technique co.,Ltd.
Location 25th Floor, Huafu Commercial Center, Wenfeng District, Anyang City,Henan Province
Contact Person Fiona

Request A Quote

Please check your email address.
Your message must be at least 20 characters.