Steel Sheet Welding Villa Keel Making Machine High Speed 15-20m/min
Price:
Negotiable
MOQ:
1 set
Delivery Time:
Within 30 days after receiving the deposit
Brand:
Shenghong
Product Description
Light Frame Steel sheet welding Villa House Keel Roll Forming Machine 15-20m/min
Product Description

|
Specification for Light Frame Steel Villa House Keel Roll Forming Machine
|
|||
|
Coil Material
|
type
|
Colored Steel Plate, Galvanized Board, Aluminum Plate
|
|
|
width
|
100-300mm (according to customer requirements and profile drawing)
|
||
|
thickness
|
0.6-0.8mm
|
||
|
Manual Decoiler
|
inside diameter
|
450-508mm
|
|
|
coil load
|
5T
|
||
|
Forming Device
|
shaft material
|
45#steel-high quality steel, diameter 50 mm
|
|
|
roller material
|
45# steel with chrome coating
|
||
|
roller station
|
12 (depends on final design)
|
||
|
Main frame
|
300 H steel
|
||
|
chain transport
|
1”
|
||
|
board thickness
|
16mm
|
||
|
Cutting System
|
cutting material
|
Gcr12 with quench treatment
|
|
|
hardness
|
HRC55-58
|
|
|
|
tolerance
|
+-1.5mm
|
|
|
|
Weight
|
around 2.5T(depends on final design)
|
||
|
Dimension
|
5000mm*800mm*1300mm(depends on final design)
|
||
|
Control System
|
PLC
|
|
|
|
Total Power
|
5.5+4kw (depends on final design)
|
||
|
Voltage
|
380V, 50HZ, 3 phascs or as your need
|
||
|
Productivity
|
15-20m/min(depends on final design)
|
||

Detailed Images


|
Machine Components
|
||
|
No.
|
Name
|
QTY
|
|
1
|
Manual uncoiler
|
1 set
|
|
2
|
Feeding and leveling device
|
1 set
|
|
3
|
Roll forming system
|
1 set
|
|
4
|
Hydraulic punching and cutting
|
1 set
|
|
5
|
Product support frame
|
1 set
|
|
6
|
PLC Control System
|
1 set
|

Packing & Delivery
Packing Details:
1. One 40ft container for loading one set machine with manual decoiler;
2. The whole Wiped Anti Rust Oil, PLC controller covered by foam film;
3. Spare parts and some small parts packed in plastic tooling box;
4. All Components Fixed by steel wire with Container.
Delivery Time:
2. The whole Wiped Anti Rust Oil, PLC controller covered by foam film;
3. Spare parts and some small parts packed in plastic tooling box;
4. All Components Fixed by steel wire with Container.
Delivery Time:
within 25 days after receipt of buyer's deposit
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jiangyin Dingbo Technology Co., Ltd
Location
No. 1, Xingyuan Road, Gu Shan Town, Jiangyin city, Jiangsu Province, China
Contact Person
Emma Teng

