ESTEL (GUANGDONG) TECHNOLOGY CO., LTD.
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

Two Compartments Outdoor Electronics Cabinet Air Conditioning For Equipments / Batteries

Price Negotiable
Price: 358-2143 usd
MOQ: 1 set
Delivery Time: 15-20 working days
Brand: ESTEL
Product Description

 

Two Compartments Air Conditioning Outdoor Telecom Cabinet For Equipments And Batteries

 

1. Cabinet Description

 

This series outdoor telecom cabinet offers standard 19” racking rails and battery shelves, is a new design for telecom projects and surveillance projects. These enclosures have provision of floor mounting. This series enclosures offer all the protection needed for outdoor requirements.Ultimate security is provided by a three-point locking system.

 

2. Cabinet Key Features

 

Item Type Technical Parameter
Structure Dimension H×W×D 1800×1600×800mm
Layout Two compartments (left compartment and right compartment, with middle division plate).
Equipment Installation Method Left compartment: battery shelves; right compartment: 19” rack
Door With two front doors, and anti-theft three point lock for outdoor cabinet (support padlock)
Material Galvanized steel; double wall
Heat Insulation 20mm PEF.
Structure Assembled
Ingress Protection IP55
Temperature Control Cooling air conditioners and fans
Lighting LED lamp 48V LED lamps; The lamps will be on when the cabinet door is open, and will be off when the cabinet door is closed.
Temperature Temperature Working Temperature: -40°C ~ +55°C
Storage Temperature: -50°C ~ + 70°C
Transport Temperature: -50°C ~ +70°C
Humidity Relative Humidity 5% ~ 100%
Pressure Air Pressure 62kpa ~ 101kpa (similar to 0m ~ 5000m altitude)
Radiation Intensity Solar Radiation Intensity 1120 ×(1±5%)W/m2

 

3. Cooling System

 

3.1 There are two air conditioners installed on the two front doors.

      500W cooling capacity air conditioner is installed on the door of the left compartment for batteries

     1500W cooling capacity air conditioner is installed on the door of the right compartmen for equipments..

 

3.2 There are 2 fans on top cover of the cabinet

 

4. Cabinet Components Installation

 

4.1 LED lamp, smoke sensor and door sensor are installed at the top of the enclosure.

4.2 Environment Monitoring Unit and PDU are installed on 19” rack.

4.3 Feeder cable and other external cables all use bottom wiring method.

 

5. Cabinet Production Pictures

 

 

6. Cabinet Quality

Our company resolutely implements the principle of quality first, we control and supervise the whole production process in strict accordance with the requirements of the ISO9001 system and the related implementation process. The quality department strictly controls all aspects like material inspection, production processes, product testing, shipment inspection and establishes traceable documents and product identification. Our quality inspection team, is very familiar with the various standards, strict implementation of the standards required sampling and testing methods.

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company ESTEL (GUANGDONG) TECHNOLOGY CO., LTD.
Location 3A-8, SHUIWAN 1979 SQUARE (PHASE II), NO. III, TAIZI ROAD, SHUIWAN COMMUNITY, ZHAOSHANG STREET, NANSHAN DISTRICT, SHENZHEN
Contact Person Fiona Liang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.