Zhenjiang Great Wall Group Co.,Ltd
                                                                                                           
Member Supplier
20 Years
Since 2006
Menu

Pontoon Bailey bridge/Temporary Steel Bridge

Price Negotiable
Price: Negotiated
MOQ: 1 set
Delivery Time: Depending on the quantity
Brand: Great Wall
Product Description

Pontoon Bailey bridge is similiar to standard bailey bridge actually;Its special feature is that the supports are made from pontoons.It has the advantages of fast-installed,easy-dismantled,parts-interchangeable,etc.
It is widely used in the military transportation,emergency earthquake and flooding relief work and road,bridge,railways construction,etc.

 

Name Bailey pontoon bridge
Alias assembled pontoon bridge; assembled highway steel bridge, steel bridge, steel trestle bridge; temporary pavement; temporary bridge; Bailey bridge;
Model 321; 200; GW D;
Commonly used truss plate models 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Maximum single span of steel bridge design about 60 meters
Standard lane width of steel bridge single lane 4 meters; double lane 7.35 meters; design according to demand.
Load Class Automobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. Tail
Design scheme According to the different spans and loads, choose the appropriate arrangement and floating box scheme.
Main Material of Steel Bridge GB Q345B
Connection pin material 30CrMnTi
Connection bolt grade 8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosion hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methods hoisting method; floating method, etc.
Installation time 30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements 15-20 workers (determined according to site conditions)
Installation equipment crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridge No need to be pier, interchangeable, removable, long service life

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhenjiang Great Wall Group Co.,Ltd
Location NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China
Contact Person Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.