Zhenjiang Great Wall Group Co.,Ltd
                                                                                                           
Member Supplier
20 Years
Since 2006
Menu

Bailey bridge/Bailey Suspension bridge/Overhung Bailey Bridge

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: Depending on the quantity
Brand: Great Wall
Product Description

Suspension Bridge is a kind of suspended-cable-system bridge,in which the steel decks are used as members,can be exerted the steel characteristic of high tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and te bridge components can be used repeatedly;The span length is adapted to 60-300m.

Specification:

 

Name Bailey Suspension Bridge
Alias Bailey suspension bridge; Assembled highway steel bridge, steel bridge, steel trestle bridge; Temporary sidewalk; Temporary sidewalk; Bailey bridge;
Model 321; 200; GW D;
Commonly used truss plate models 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Design maximum single span of steel bridge 300 meters
Standard lane width of steel bridge single lane 4 meters; double lane 7.35 meters; design according to demand.
Load Class Automobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. "
Design scheme According to the different spans and loads, choose the appropriate arrangement and suspension bridge scheme.
Main Material of Steel Bridge GB Q345B
Connection pin material 30CrMnTi
Connection bolt grade 8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosion hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methods cantilever launching method; hoisting method; floating method; in-situ assembly method; pile-up construction method, etc.
Installation time 30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements 15-20 workers (determined according to site conditions)
Installation equipment crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridge large span, no need to make pier, fast assembly, interchangeable, removable, long service life
Certification ISO, CCIC, BV, SGS, CNAS, etc.
Implementation criteria JT-T/728-2008
Manufacturer Zhenjiang Great Wall Heavy Industry Engineering Technology Co., Ltd.
Annual output 12,000 tons

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhenjiang Great Wall Group Co.,Ltd
Location NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China
Contact Person Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.