HORIZON FORMWORK CO., LTD.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Doka Frami Clamp Concrete Forming Accessories Cast Iron Material

Price Negotiable
Price: pls ask HORIZON
MOQ: 2000 pcs
Delivery Time: 15-25 days
Brand: HORIZON
Product Description

Doka Frami Clamp to Align Wall Formwork Panels ,Concrete Forming Accessories

 

Advantages of the Frami clamps:

1). Provide self-aligning, crane-handling and safe connections between the panels

2). One single standard clamp makes assembly work simple and fast.

3). Dirt-resistant and hard-wearing for site use

4). Easy to fix. A formwork hammer is enough to lock and release the clamp.

Pin Length

151mm

Width

110mm

Height

133mm

Weight

1.2kgs


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company HORIZON FORMWORK CO., LTD.
Location HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Contact Person H. Chang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.