Machinery Building Material Machinery Steel Frame & Purlin Machines

Durable Highway Guardrail Roll Forming Machine 300 H - High Grade Steel Frame Material

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 30 days after your pre-deposit
Product Description
Auto Highway Guardrail Forming Machine Ac380V 50Hz Three Phase 16 Rows
 
Product Description

 

highway guardrail roll forming machine Process flow:

Uncoiling→Feeding material into machine→Roll forming→Measuring length→ Auto cutting

→Products receiving

Parameters of highway guardrail roll forming machine :

 

1 Model No. Two waves highway roll forming machine
2 Max coil thickness 3.5mm
3 Coli material Steel or other
4 The bearing capacity of manual decoiler 5 tons
5 shaft material 45#steel
6 Out diameter 100mm
7 numbers of forming steps 20 stations
8 transmission Differential gear transmission
9 Forming speed 10-15m/min
9 main motor power 45kw
10 voltage 380V50HZ Three-phase or you need
11 dimension 20.5*1.2*1.5m
12 cutting Hydraulic cutting
13 Cutting power 13.5kw
14 blade material Cr12 steel with quenched treated 60-62°c
15 control system PLC(Delta)
16 length tolerance ±2mm
17 spare parts

easy emaged parts:conk 2pcs,

fuse-link 4pcs

rubber mat: 1 pcs

bolt spanner: 1 pcs

18

The whole line including: Hydraulic decoiler, roll forming machine, cutting part

PLC control system, run-out table.

Components of highway guardrail roll forming machine :

No. Name Unit Qty
1 decoiler set 1
2 Main forming machine set 1
3 PLC control system set 1
4 Hydraulic pump station set 1
5 Post cut set 1
6 Electric motor set 1
7 Output table set 1

some pictures of machine:

 

Packaging & Shipping

the machine naked in the container or packing as your required.

Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment.

Delivery: within 45 working days after receipt of deposit

Guarantee: One year, and we will provide the technical support for the whole life.

 

FAQ:

1. How to get a quotation of guard rail machine?
Give me the profile drawing and thickness for the guard rail machine,this is the important.
Other spicific requirements is welcome,such as the speed,power and voltage you want.

 

2. Terms of payment:
30% T/T, Balance to be paid before shipping after inspection.Also we accept the payment L/C, O/A , D/P.

 

3. How long the guard rail machinecould be made?
Normally speaking, guard rail machinecould be made without 45 working days. If you need roll forming machines in a hurry, we can make it for you less than a month.

 

4. What is your after-sale service?
guard rail machinewarranty period is 12months,if the broken parts can't be repaired,we can send new to replace for free,but you need to pay the express cost yourself.we supply the technical support for the whole life of the equipment.

 

5. You are trade company or factory?
We are trade company but we also have own factories. Building trade company is just for exporting various types of roll forming machines.

 

6. How to visit your company?
a. Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can pick up you.
b. Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company RFM Cold Rolling Forming Machinery
Location Taida Building 8007 Cangzhou city Hebei Provience China
Contact Person Amerilia cui

Request A Quote

Please check your email address.
Your message must be at least 20 characters.