Machinery Building Material Machinery Steel Frame & Purlin Machines

Durable Ridge Cap Roll Forming Machine 8 - 15 M / Min Production Capacity For Building

Price Negotiable
Price: negotiate
MOQ: 1 set
Delivery Time: within 30 days after receiving deposit
Product Description

Roofing End Cap Ridge Cap Roll Forming Machine For Building 8-15 M/Min

 

Description:

 

Configurations Manual Uncoiler ,Guiding Platform ,Coil Strip Leveler ,Main Machine Of Roll Forming ,Electric-Motor, Glazed Tile Pressing Device ,Cutting Device ,Hydraulic Station ,PLC Control, Supporter Table.
Control System PLC Delta Inverter
Main Frame 400mm H-Beam
Main Power 4 kw
Pump Power 3 kw
Power Supply 380V, 3-Phase,50Hz
Forming Speed 4-8m/min
Roll Station 14 stands
Roller Diameter 65mm
Hydraulic Pressure 10-12MPa
Forming Size 312mm
Feeding Thickness 0.27-0.8mm
Feeding Width 600mm
Backboard Thickness 18mm
Chain Size 33mm
Cutter Standard Cr12
Roller Standard Cr12
Cr-Plating Size 0.05mm
Overall Size 6000×1000×1200mm
Total Weight 3T

 

Automatic system

 

Pump station 3kw
PLC Panasonnic
Transducer Twiwan"Delta"
Encoder Wuxi's "REP"or "XINYA"
Switch "CHINT" or "DELIXI"

 

Component line

 

NO Name Unit Qty
1 Man-made decoiler set 1
2 Main machine for roll forming set 1
3 Control system set 1
4 Hydraulic system set

1

 

 

Packaging & Delivery

 

Packaging Details machinery manufacturer new design steel glazed tile roll forming machine from china
1.Tighten to container with steel wire rope and welded angel iron.
2.Main forming machine and unciler is naked (if you need we can also packed with water-proof plastic)
3.PLC control system and moter pump are packed with water-proof plastic coverage.
Delivery Time 30 days after your pre-deposit

 

FAQ about roll forming machine :


Q:How is this machine's service life?
A:In the normal maintenance,the service life at least 8 years.

Q:How to maintenance?
A:If using frequently,best coating lubricant on the chain and two ends of the shaft every month,replace the hydraulic oil every 1-2 years.

Q:What can you do if the machine broken?
A:Our machine's warranty period is 1 year,if the broken parts can't repair,we can free send the new parts replace the broken parts to you except the solenoid valve,the solenoid valve you must pay the express cost yourself.if after warranty period,we can through negotiationfor to solve the problems,and we supply the technical support for the whole life of the equipment.

Q:Can you be responsible for transport?
A:Yes,please tell me the destination port or address.we have rich experience in transport.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company RFM Cold Rolling Forming Machinery
Location Taida Building 8007 Cangzhou city Hebei Provience China
Contact Person Amerilia cui

Request A Quote

Please check your email address.
Your message must be at least 20 characters.