Henan Perfect Handling Equipment Co., Ltd.
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu

Casting Factory 1-300t ATundish Transfer Cart In Steel Plan Apparatus

Price Negotiable
Price: USD 4000~8500 set
MOQ: 1 set
Delivery Time: 20 work days after received balance payment
Brand: AGV battery powered transfer cart apparatus
Product Description

 

casting factory use1-300t ATundish Transfer Cart Used in Steel Plan apparatus

 

Preview

 

Our heavy load handing cart for ladle transportation is made up of high temperature bearing materials and special structure. It's powered by battery. The battery is fitted in the inner of the cart. The direct-current machine gets its power from the electric control system, which make the cart to start, stop, move forward and move backward. It could run on straight line, L-form track or curved track. We can also fit hydraulic lifting system if needed.

 

AGV battery powered transfer cart apparatus

 
Technical Parameters  
 
Model 2t 20t 50t 100t 150t
Rated Load(t) 2 20 50 100 150
Table Size(mm) Length(L) 2000 4000 5500 6500 10000
Width(W) 1500 2200 2500 2800 3000
Heigth(H) 500 600 700 1000 1200
Wheel Base(mm) 1200 2800 4200 4900 7000
Rail Inner Gauge(mm) 1200 1435 1435 2000 2000
Wheel Diameter(mm) 270 350 500 600 600
Wheel Quantity 4 4 4 4 8
Ground Clearance(mm) 50 50 50 75 75
Running Speed(min) 0-25 0-20 0-20 0-20 0-18
Motor Power(kw) 0.8 2.5 5.5 11 15
Running Distance(m) 25 30 50 50 50
Max Wheel Load(KN) 14.4 77.7 174 343.8 265.2
Reference Weight(t) 2.5 5.6 7.8 14.1 26.2
Recommended Rail Model P15 P24 P43 QU100 QU100
 
production process 
 
CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling.
Post weld treatmen
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint.
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.

Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
.
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will
be tested without load and then with load. After the inspection, the cart will be transported to storage area.
 
Advantages
 

Low noise
It causes low noise level.
Maximum safety
We make sure a maximum safety for operators and the material handled. What we really care is the safety of everyone involved in the process of machine operation.
Easy for operation
These vehicles are easy to drive, so as soon as you get it you will be able to use it to transport your loads. We will support you to make the best out of your heavy load transporter.
Easy to implement into manufacturing process
Operates on standard floors; Do not require complex or permanent installation.
Suitable for All Kinds of Weight
The steering battery powered trolley is superb for handling both small and extremely huge loads for its modular fabrication and its highest payloads

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Henan Perfect Handling Equipment Co., Ltd.
Location 7th, Jiayi Oriental Pearl Building, Northwest of Xinzhong Road and Jinsui Road,Xinxiang, Henan
Contact Person Mike Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.