Henan Perfect Handling Equipment Co., Ltd.
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu

Steel Mill Die Motorized Flat Cart for Bay to Bay Die Transport Cart on Cement Floor

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: 45 Days
Brand: PERFECT
Product Description

Steel Mill Die Motorized Flat Cart for Bay to Bay Die Transport Cart on Cement Floor

 

Introduction 

 

Perfect Material Handling offers a wide range of Die Transport Cart specifically designed for the unique needs of both stamping and molding. These products include Die Transport Equipment, Die Cart, and Die Transfer Trolleys and Die Trailers Systems.
This Die Transport Cart could run on railways or cement floor which is chosen according to the transportation route or clients' project plan. The selecting concept: the rail transport cart is mainly used for fixed route no need of rotation; while the trackless transfer trolley on cement floor can realize 360° direction turning.

 

Application places 

 

The Die Transport Cart of PERFECT allow movement charges at ground level in all types of industries and applications, such as warehouse, within or without factory, bay to bay, airport, sea port, manufacturing workshop, production line, and son on.

 

Parameters

 

Model BWP-5t BWP-20t BWP-30t BWP-40t BWP-50t
Rated Load(t) 5 20 30 40 50
Impacted rated load(t) 5 20 30 40 50
Structure of Frame Steel plates welded, beam
thickness of the steel plate 8 14 14 16 16
Cart weight(t) 4.3 7.9 8.8 10 10.5
Max. wheel load (t) 2.8 5.6 7.7 10 12
Ground requirement Cement floor or Steel plate ground
Ground Clearance(mm) 50 50 50 50 50
Table size (mm) 3000*2000 4500*2200 5000*2200 5500*2300 6000*2300
Height of the whole cart (mm) 450 600 650 700 700
Wheel base (mm) 1500 1700 1700 1800 1800
Axles distance (mm) 2500 3900 4300 4800 5200
Turning radius (mm) 2501 3901 4301 4801 5201
Turning type Turning while driving with no stop
Control method for turning Control button
Turning structure Mechanical
Motor power (KW) 3.5 7 10 12 15
Wheel diameter (mm) 300 (4) 400 (4) 400 (6) 500 (6) 500 (6)
Wheel material ZG55+hydropurture
Running speed (m/min) 0-15 0-12
Brake principle Electric magnetic brake
Ground balance mechanical automatic adjustment
Operation method With wire or no wire
Battery model D-250 24pieces D-440 24pieces D-250 36pieces D-330 36pieces D-440 36pieces
Battery maintenance Free of maintenance
Charger's installation Installed on cart Split-type
Cart color Yellow and warning sign
Charger's function Automatic stop for obstacles
Radar control 3-0.3 m, Automatic stop for obstacles
Warning equipment Sound and light
Other functions Turning light, night light and power display

 

 

 

Processing

CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.

 

Trackless Transfer Trolley

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Henan Perfect Handling Equipment Co., Ltd.
Location 7th, Jiayi Oriental Pearl Building, Northwest of Xinzhong Road and Jinsui Road,Xinxiang, Henan
Contact Person Mike Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.