Product Description
30t heavy load customized industrial transport wagon on rails powered by battery cart
Preview transfer cart
Our heavy load handing cart for ladle transportation is made up of high temperature bearing materials and special structure. It's powered by battery. The battery is fitted in the inner of the cart. The direct-current machine gets its power from the electric control system, which make the cart to start, stop, move forward and move backward. It could run on straight line, L-form track or curved track. We can also fit hydraulic lifting system if needed.
Production process
CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling.
Post weld treatmen
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint.
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish.
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will be tested without load and then with load. After the inspection, the cart will be transported to storage area.
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling.
Post weld treatmen
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint.
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish.
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will be tested without load and then with load. After the inspection, the cart will be transported to storage area.
parameter of cart
| Model | BXC-2t | BXC-20t | BXC-50t | BXC-100t | BXC-150t | |
| Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
| Table Size (mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
| Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
| Height(H) | 450 | 550 | 650 | 900 | 1200 | |
| Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
| Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 200 | 2000 | |
| Wheel Diameter (mm) | 270 | 350 | 500 | 600 | 600 | |
| Running Speed (m/min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
| Motor Power(kw) | 1 | 2.2 | 5 | 10 | 15 | |
| Battery Capacity | 180 | 180 | 330 | 440 | 600 | |
| Battery Voltage | 24 | 48 | 48 | 72 | 72 | |
| Running Time When Full Load | 4.32 | 4 | 3.3 | 3.2 | 2.9 | |
| Running Distance for One Charge(km) | 6.5 | 4.8 | 4 | 3.8 | 3.2 | |
| Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 | |
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Henan Perfect Handling Equipment Co., Ltd.
Location
7th, Jiayi Oriental Pearl Building, Northwest of Xinzhong Road and Jinsui Road,Xinxiang, Henan
Contact Person
Mike Wang