Peru Pouplar Design Double Layer Roofing Sheet Cold Roll Forming Machine
Peru Pouplar Design Double Layer Roofing Sheet Cold Roll Forming Machine
㈠. Profile drawing:
As customer request
㈡. Working flow:
Decoiler---------feeding--------roll forming--------cut to length-----output table
㈢. Machine components:
De-coiler------------------------------------------1set
Forming machine--------------------------------1set
Cutting device-----------------------------------1set
PLC control box ---------------------------------1set
Hydraulic pump station-------------------------1set
Output table---------------------------------------1set
Technical Parameter
|
Part details |
Item Name |
Specification |
|
Manual uncoiler |
carrying capacity |
5-8 tons |
|
Stype |
Manual |
|
|
Raw coil |
Coil material |
steel |
|
Coil thickness |
0.3-0.8 mm |
|
|
Machine body |
Roller station |
15 station |
|
Roller material |
45# steel |
|
|
Shaft material |
45# steel |
|
|
Shaft diameter |
75 mm |
|
|
Machine weight |
About 6.5 tons |
|
|
Machine size |
5-7.5*1.3*1.3 m |
|
|
Speed |
8-12 m/min |
|
|
Cutter |
Operate |
Hydraulic cutting |
|
Blade material |
Cr12 |
|
|
Power |
Operate |
Chain transmission |
|
Chain size |
1 inch chain |
|
|
Control system |
PLC brand |
Taiwan delta |
|
Motor power |
7.5 kw |
|
|
Hydraulic pump power |
3 kw |
|
|
Voltage |
380V 50Hz 3phase |
|
|
Machine color |
As ur need |
|
|
Machine language |
Chinese and English |
Payment type: 30% T/T prepaid and70% balance should be paid before loading
Delivery time: 30 days after receiving advance payment.
Guarantee period: 12months free service/ pay service all the machine life
Installation and training:
① If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
② Without visiting,we will send you user manual and CD to teach you to install and operate.
③ If buyer needs our technician to go to your local factory,please arrange board and lodging and other necessary things.
Packaging :
1. Tighten to container with steel wire rope and welded machine with container by angel iron
2. Main forming machine and un-coiler is naked(If you need we can also packed with water-proof plastic)
3. PLC contral system and motor pump are packed in wooden box with water proof paper coverage
Installation and training:
1.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
2.Without visiting, we will send you user manual and video to teach you to install and operate.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

