U Purlin Automatic Construction Steel Cold Roll Forming Machine 1-4mm Thickness 11kw Power 380V
Price:
22000-23000USD
MOQ:
1set
Delivery Time:
30days
Brand:
ST
Product Description
Product Overview
Technical Specifications
| Parameter | Specification |
|---|---|
| Suitable Material | GI, PPGI, PPGL |
| Material Thickness | 1-4mm |
| Roller Material | High grade 45# forged steel, surface hard chromium plating |
| Roller Stations | 16 stations |
| Shaft Material | High grade 45# forged steel |
| Shaft Diameter | 70mm |
| Blade Material | Cr12 Heat Treatment |
| Cutting Mode | Hydraulic Guide Column |
| Production Speed | 20-25m/min |
| Side Plate Thickness | 20mm |
| Chain Size | 1 inch |
| Total Power | 11kw |
| Voltage | 380V 50HZ 3Phase |
| Dimensions (L×W×H) | 7000mm×1500mm×1600mm |
| Weight | 7 tons |
| Electronic Control System | PLC (Delta) Touch Screen |
Additional Product Images
Frequently Asked Questions
Does one machine produce only one style panel profile?
Not exactly. For wider and double layer making machines, it can produce more than 6 kinds of panels.
Do you provide after-sales support?
Yes, we offer technical advice and have skilled technicians available worldwide to ensure your machines remain operational.
How to visit your company?
A. Fly to Beijing airport: Take high-speed train from Beijing Nan to Cangzhou Xi (1 hour), then we can pick you up.
B. Fly to Shanghai Airport: Take high-speed train from Shanghai Hongqiao to Cangzhou Xi (4.5 hours), then we can pick you up.
B. Fly to Shanghai Airport: Take high-speed train from Shanghai Hongqiao to Cangzhou Xi (4.5 hours), then we can pick you up.
What if the machine breaks down?
Our machine warranty period is 12 months. If parts cannot be repaired, we send replacement parts free of charge (customer pays express cost). After warranty, we provide technical support for the equipment's entire lifespan.
Can you handle transportation?
Yes, please provide your destination port or address. We have extensive transportation experience.
Are you a trade company or factory?
We are a trade company with our own factories, established specifically for exporting various types of cold roll forming machines.
Why is your price higher than others?
We prioritize quality and invest in developing more automatic, accurate, and high-quality machines. Our equipment lasts over 20 years without problems, and we provide 2 years of free quality assurance.
How long does it take to manufacture the machine?
Normally, welded pipe making machines are completed within 45 working days. For urgent orders, we can deliver in less than one month.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Botou Shitong Cold Roll Forming Machinery Manufacturing Co., Ltd.
Location
West Side Of No. 1 Road, Economic Development Zone, Botou, Hebei, China (Mainland)
Contact Person
Jack Wu