Highway Crash Barrier 3-Wave Roll Forming Machine | 488mm Width, 22kW Power, 8-10m/min Production
Price:
50000-55000 usd per set
MOQ:
1set
Delivery Time:
30 days after receiving the deposit
Brand:
ST
Product Description
Highway Crash Barrier 3-Wave Roll Forming Machine
Professional manufacturing equipment for producing highway guardrail systems with precision engineering and robust construction.
Technical Specifications
| Parameter | Specification |
|---|---|
| Suitable Material | SS400 hot roll coil |
| Width of Raw Material | 488 mm |
| Rows of Rollers | 18 rows |
| Appearance Size | 14×1.1×1.3 m |
| Total Power | 22 kW |
| Thickness of Raw Material | 1.5-3 mm |
| Productivity | 8-10 m/min |
| Diameter of Shaft | ¢80 mm |
| Voltage | 380V 50Hz 3 phases |
| Weight | 20 tons |
Spare Parts & Components
Business Terms
Packing Method
Main machine is packaged with plastic film for protection during transit.
Transportation
All machines require one 20-foot container for shipping.
Payment Terms
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 30 days after receiving deposit.
Warranty & Support
Two-year comprehensive warranty with lifetime technical support. Includes free replacement of critical components (chains, bearings, rollers, oil pipes, counting wheels) during warranty period.
Frequently Asked Questions
Does one machine only produce one style panel profile?
Not exactly. For wider and double layer making machines, it can produce more than 6 different panel types.
Do you provide after-sales support?
Yes, we offer comprehensive technical advice and have skilled technicians available worldwide to ensure your equipment operates efficiently.
How to visit your company?
Option A: Fly to Beijing airport, take high-speed train from Beijing Nan to Cangzhou Xi (1 hour), then we provide pickup service. Option B: Fly to Shanghai Airport, take high-speed train from Shanghai Hongqiao to Cangzhou Xi (4.5 hours), then we provide pickup service.
What happens if the machine breaks down?
During the 12-month warranty period, we provide free replacement parts (customer covers express costs). After warranty, we offer negotiated solutions and lifetime technical support.
Can you handle transportation?
Yes, we have extensive experience in international shipping. Please provide your destination port or address.
Are you a trading company or factory?
We operate as a trading company with our own manufacturing facilities, specializing in exporting various cold roll forming machines.
Why is your price higher than competitors?
We prioritize quality and invest in developing highly automated, precise, and durable machinery. Our equipment is designed for over 20 years of reliable operation with a 2-year quality assurance guarantee.
How long does it take to manufacture the machine?
Typically, welded pipe making machines require up to 45 working days. For urgent orders, we can complete production in less than one month.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Botou Shitong Cold Roll Forming Machinery Manufacturing Co., Ltd.
Location
West Side Of No. 1 Road, Economic Development Zone, Botou, Hebei, China (Mainland)
Contact Person
Jack Wu