Orange Color Light Gauge Steel Framing Machines 2500KGS For Prefabricated House

Price Negotiable
Price: Negotiation
MOQ: 1 Set
Delivery Time: 30~35 work days
Brand: Lebron-Machinery
Product Description

 

Fast speed green color F89 light gauge steel framing machine prefabricated house

 

 

1. Description of C89 type Light Gauge Steel Framing machine

 

This Light Gauge Steel Framing Machine is for producing the studs and tracks which are used in light gauge steel structure buildings. The studs and tracks which are produced by the Light Gauge Steel Framing Machine are light. The building steel structure can be quickly built without normal heavy tools and equipment. Every component can be easily carried by hand. The main tool is a light, hand-held screw gun. Because the steel is strong, LGS structures are lighter than wood framed structures of equivalent strength.

 

The normal speed of this Light Gauge Steel Framing Machine can reach 300-700/hour, but the max speed can reach 2800m/hour. The punching hole accuracy is +/-0.5mm. This machine can continuously work without any jams

 

 

2. Main technical data of LGS Framing Machine

 

Size 3700*800*1100mm
Weight 2500KGS
Main Servo Motor Power 7.5KW
Hydraulic Power for Punching & Cutting 7.5KW
Forming Steps 7 steps roll forming+2 steps reshaping
Processing Speed

Typical Drywall Panel Frame 600-720m/h

Roll Forming Speed without punch:2700m/h

Over All Production Capacity:4-5tons/8hours

Voltage 380V/50HZ/3PH
Height 38mm
Width 89mm
Lip of C Profile 10mm
Tolerance Of Cutting & Punching ±0.5mm
Tolerance Of Forming 0.75mm
Forming Thickness 0.7mm -1.2mm

 

 

 

3. Main Accessories of LGS Framing Roll Forming Machine

 

No. Description
1 Main Forming Machine
2 1.5T Hydraulic Strip Uncoiler
3 Automatic Punching Device
4 Hydraulic Motor System
5 IPC Computer Controlling System with Product Software
6 Hydraulic Post-cutter
7 Automatic Printing Device
8 Vertex BD Design Software
9 Run Out Table
10 Tools
11 Operation Manual

 

 

 

4. Installation service

 

a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

b. Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.

 

c. The buyer should arrange the accommodation, food, and traffic in the destination

 

d. Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

e. With in 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Lebron Machinery Technology Co., Ltd.
Location 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Contact Person Alfred

Request A Quote

Please check your email address.
Your message must be at least 20 characters.