Machinery Building Material Machinery Steel Frame & Purlin Machines

25m/Min 12 Rows Stud And Track Roll Forming Machine High Accuracy

Price Negotiable
Price: USD 10000~30000 per Set
MOQ: 1 Set
Delivery Time: 30 days
Brand: Lebron-Machinery
Product Description

Steel Building Materials Steel Stud And Track Forming Machine Steel Framing Machine

 

 

1. Description:

 

For the Steel Stud and Track Roll Forming Machine, if a wider material is fed, the roll forming machine can produce a stud; if a smaller width material is fed, the roll forming machine can produce the stud, and it can also be programmed to punch on the stud or the track.

 

Studs, rails, and Omega slots are called drywall slots and are used to make economical wall and ceiling frames.

 

Metal studs and channels are strong, lightweight, easy to install, and come in a variety of sizes, providing ideal wall and ceiling applications for multi-layer plasterboard.

 

Gypsum board molding machine can be used automatically with Mitsubishi or Siemens control system

 

 

2. Main Technical Parameters

 

No. Item Description
1 Main Power 5.5KW
2 Drive System Chain
3 Roll Forming Speed over 20m/min
4 Roller Station 12 stations
5 Roller Material 45# steel, quenched. Coated with 0.05mm chrome
6 Shaft Material 45# steel, quenched, coated with 0.05mm chrome
7 Shaft diameter 70mm

 

 

3. Workflow:

 

Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving

 

 

4. Main Components

 

No. Name Quantity
1 3-Ton Decoiler 1 Set
2 Feeding Guider 1 Set
3 Roll Forming Machine Unit 1 Set
4 Hydraulic Punching Device 1 Set
5 Hydraulic Servo Tracking Cutting Device 1 Set
6 Hydraulic Station 1 Set
7 Receiving Table 1 Set
8 Electric Control Cabinet 1 Set

 

 

5. Brands of Electrical Appliances

 

No. Name & Brand Brand
1 PLC Germany Siemens
2 Frequency Converter Japan Yaskawa
3 Touch Screen Germany Siemens
4 Encoder Japan Omron
5 Other Electrical Accessories France Schneider

 

 

6. After-Sale Service

 

After the machine arrives at the destination, if the buyer wishes, the seller will send technicians to the buyer’s factory for installation. The buyer needs to provide some technical personnel to assist in the installation work.

 

The installation period is approximately 5 days. The buyer should prepare for the steel plate and place the machine on the foundation before the seller’s technicians leave.

 

The buyer should arrange accommodation, food, and transportation at the destination

 

Training time: 2 days. (If the buyer needs, we can provide training at the operation site)

 

Within three months after the goods arrive at the port of destination, if the buyer does not require payment in installments, the goods shall be counted as qualified goods. The inspection standards are based on the technical standards signed by both parties and our company standards.

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Lebron Machinery Technology Co., Ltd.
Location 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Contact Person Alfred

Request A Quote

Please check your email address.
Your message must be at least 20 characters.