10KL Per Hour Seawater Desalination Equipment , Sea Water RO Purification System

Price Negotiable
Price: Discussible
MOQ: 1 unit
Delivery Time: 7-15 days
Brand: Chunke
Product Description

10KL Per Hour Seawater Desalination Equipment , Sea Water RO Purification System

 

 

Adjustment of reverse osmosis equipment valves:

 

The flow and pressure of the reverse osmosis system have certain requirements. The equipment should be adjusted to the appropriate state to

 

make the reverse osmosis system run stably. It only needs to be adjusted once, and then the manual valve opening can be kept unchanged.

 

Water treatment equipment pp cotton soft water equipment

 

1. Check the electrical appliances and piping to ensure that the original water tank has water;

 

2. Open the water source switch before the water solenoid valve

 

3. Fully open RO high pressure pump rear ball valve, concentrated water discharge valve, closed return valve

 

4. Open [Original Pump/Manual], [High Pressure Pump/Manual], [Total Power/ON].

 

5, the RO system starts running

 

6. Adjustment of the pressure switch before the high pressure pump: The pressure switch in front of the high pressure pump mainly prevents

 

damage to the equipment caused by the high pressure pump still running when the water pressure is insufficient. Adjust the pressure switch

 

before the high pressure pump to 0.5kg/cm2, and properly close the valve after the high pressure pump, so that the high pressure pump does

 

not start frequently.

 

7. Adjust the concentrated water discharge valve (closed) reverse osmosis membrane [inlet water pressure] about 0.8--1Mpa, the concentrated

 

water flow rate is about: 0.6m3/h, and the pure water flow rate is about 1.5m3/h. Adjust the return water valve so that the concentrated water

 

flow rate is about 0.6-1.0m3/h, and the [inlet water pressure] is about 0.8--1Mpa. (When all the drains can be used, it is recommended to close

 

the return water valve, which is beneficial to increase the life of the membrane.

 

Automatic control process of the main system of reverse osmosis equipment: water treatment equipment pp cotton soft water equipment

 

Flow diagram: When the button is all set to automatic, the device is executed as follows:

 

When starting up, the raw water solenoid valve and flushing solenoid valve are fully open, and the high pressure pump is turned on after 5

 

seconds. After flushing for 30 seconds, the flushing solenoid valve is closed and the system enters the normal water supply state.

 

When the system is connected with pure water high level control (floating ball switch), the system automatically opens the flushing solenoid

 

valve and closes the high pressure pump when the water is full. After the low pressure flushing for 20 seconds, the original water pump and the

 

water inlet solenoid valve are closed. When the original water tank has water and the pure water tank is low, the original water pump, high

 

pressure pump and water inlet solenoid valve are automatically opened to make water.

 

When the current processing system is automatically flushed or regenerated, the high pressure pump stops and the water inlet solenoid valve closes.

 

 

Detail Pictures :


Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Chunke Environmental Technology Co., Ltd.
Location 8 Suyuanzhuang, Junhe Street, Baiyun District, Guangzhou, China
Contact Person Jessie LI

Request A Quote

Please check your email address.
Your message must be at least 20 characters.