IP67 Waterproof Solar Road Studs Battery Ni Mh Powered for Outdoor
Price:
Price: USD 4.5- 5 per/ pcs
MOQ:
10
Delivery Time:
5 working days
Brand:
changdaneng
Product Description
IP67 Waterproof Battery Ni Mh Powered Solar Road Studs Solar LED Dock Lights for Outdoor
Reduce Traffic Congestion, stay away from traffic accident, save more life!
Products Description
|
Power supply
|
Solar Cell(monocrystalline silicon )2V / 140MA
|
|
Battery
|
Ni-MH 1.2V / 600MAH
|
|
Type
|
Solar LED light
|
|
LED
|
6
|
|
Reflector Color
|
White/red /yellow/blue/green/customized
|
|
Waterproof Level
|
IP67
|
|
Lighting condition
|
Front light brightness < 500Lux
|
|
Work Temperature
|
-20℃~70℃
|
|
Working Mode
|
Constant bright and RGB
|
|
Working Time
|
20h
|
|
Visual Distance
|
>1000m
|
|
Working Life
|
>3 years
|
|
Warrantty
|
2 years
|
|
Product Size
|
82*57*220MM
|
|
Toughened glass high resist compression
|
>30T
|
Products Picture
Package&Shipping
Installation
Spike installation is not a complicated matter, but there are many details that require attention. These details play an important role in ensuring the quality and service life of spike.
1. This is most important, please placed in isolation facilities installation safety first, then everyone should be in the safe facility when installing.
2. Determine the installing location. To ensure the installing location is smooth, should level scalable, craks, uneven pavement first, also please be sure the solar panel is being shined by sunlight .
3. To ensure the installing location dry, should clean up it with the brush,
4. Evenly apply appropriate glue on the spike;
5. Firmly press the spike on the installation location with right direction, if the glue is more, please must clean it up;
6. If it is aluminum alloy with pillar, the hole depth must be 1cm deeper than the pillar, hole diameter must be 2mm larger than pillar diameter.
7. After installing, please check it every 2h, to ensure that all the spikes are installed at the right direction and good condition.
8. After the glue curing for 4 hours, removed installation isolation facilities.
Certification
FAQ
Q1. How could I get a sample?
A1: We accept sample order. Please afford the sample cost and express fee.
Q2. What is sample time?
A2: Within 5 days.
Q3. Could you make our brand on your products?
A3: Yes. We could print your logo on both the products and the packages if you can meet our MOQ.
Q4. Could you make products by our color?
A4: Yes, The color of products can be customized.
Q5. How to guarantee the quality of your products?
A5: 1)Strict detection during production.
2) Strict sampling inspection on products before shipment and intact product packaging ensured.
Q6. How do you ship the goods and how long does it take to arrive?
A6: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional. We could also ship it by railway and by sea.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen Changdaneng Technology Co., Ltd.
Location
3 floor,Xingqiang Trading Building,De Zheng Road,Dalang Street,Longhua,Shenzhen city,Guangdong, China 518109
Contact Person
Icy Zeng







