Shenzhen Mysun Insulation Materials Co., Ltd.
                                                                                                           
Verified Supplier
27 Years
Since 1999
Menu

UL3916 XLPE Cable 3000V 150C Tinned Copper High Voltage Wire for EV & High Voltage Systems

Price Negotiable
Price: Negotiable
MOQ: 1000
Delivery Time: Negotiable
Brand: Mysun
Product Description
UL3916 XLPE Cable 3000V 150°C Tinned Copper High Voltage Wire
Supplies Fortune 500, Top New Energy Cable Supplier In China
Product Specifications
Size (AWG) Construction (No./mm) Diameter (mm) Nominal Thickness (mm) Diameter (mm) Max. Cond Resistance (Ω/KM) Unit Length (M/FT)
307/0.100.300.601.50381610/2000
287/0.1270.380.601.58239
267/0.160.500.601.70150
247/0.20.600.601.8094.2
2217/0.160.760.782.3259.4
2021/0.180.940.782.5036.7
1816/0.2541.190.782.7523.2
1626/0.2541.500.783.0614.6
1441/0.2541.890.783.458.96
1265/0.2542.370.783.935.64100/328
10105/0.2543.020.784.583.55
9131/0.2543.360.784.922.813
8166/0.2543.751.156.052.23
7209/0.2544.211.156.511.768
6263/0.2544.791.537.851.403
4169/0.406.021.539.080.882
2268/0.407.601.5310.660.5548
1/0426/0.4010.82.1015.000.3487
2/0537/0.4012.22.1016.400.2766
3/0677/0.4013.72.1017.900.2194
4/0547/0.4015.422.1019.600.1722
Contact us for a competitive quote
Our Products
UL3916 XLPE Cable product display
Application
UL3916 XLPE Cable applications in EV and high voltage systems
Company Profile
Our manufacturing facility and company overview Quality control and production processes
Frequently Asked Questions
How can I contact your company?
We are always ready to serve you via Email, Telephone, Fax, Skype, Whatsapp or Mobile
What is your working time?
Monday-Saturday: 7:30AM-17:00PM (Beijing time, GMT+08:00). We have public holiday during May 1-3, Oct 1-7 and Chinese New Year holiday. Please email us during our holiday if you have any questions.
Do you provide free samples?
Yes, we can provide a free sample for testing. Buyer should bear all the shipping costs.
What is your payment terms?
T/T, L/C, D/A, D/P, Western Union, MoneyGram, Paypal
What is the lead time?
Usually sample lead time is 7 days after payment has been confirmed.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Mysun Insulation Materials Co., Ltd.
Location Unit2005, Block B of Shenye U centre,Hangcheng, Bao'an District, Shenzhen 518102, Guangdong, China
Contact Person Peter Sun

Request A Quote

Please check your email address.
Your message must be at least 20 characters.