Chongqing Linde Technology Development Co., Ltd.
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Simple Installation Industrial Wastewater Treatment Plant Intelligent Customized Color

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 1-7working days(depand on raw materials stocking)
Brand: Linde
Product Description

Medical Wastewater Treatment Equipment

 

1) Equipment Name: Medical Wastewater Treatment Equipment

 

2) Applied occasions:

Hospital sewage contains some special pollutants, such as drugs, disinfectants, diagnostic agents, detergents, as well as COD, BOD5, ammonia nitrogen, SS, pathogenic microorganisms, parasite eggs and various viruses, such as Ascaris eggs, hepatitis virus, tuberculosis and dysentery. Compared with industrial wastewater and domestic sewage, it has the characteristics of small water volume and strong pollution. If discharged during the term, it will inevitably pollute the water source and spread the disease.

 

3) Equipment picture:

A: Ground installation

 

B: Underground installation

 

Equipment diagram:

 

 

Flow chart:

 

 

Installation site picture:

 

 

Product Name Hospital wastewater treatment equipment Processing capacity According to customer needs
Material Carbon steel, stainless steel, glass steel Warranty 1 Year
Performance Remove various pollutants from wastewater and purify water Delivery Time 7-15 days
Availability Customer reservation (customized according to customer requirements)

 

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

Advantages: advanced technology, intelligent equipment, convenient transportation, simple installation and good processing effect.

Domestic sewage treatment equipment A0 A20 A30 MBBR MBR 5-500 cubic / day

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Linde Technology Development Co., Ltd.
Location 1-4, No. 247-97, Mangrove Community, Taoyuan Avenue, Yubei District, Chongqing
Contact Person Xiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.