Xiamen Comwinning Imp.&Exp.Co.,Ltd
                                                                                                           
Verified Supplier
29 Years
Since 1997
Menu

SC200BG Building Site Hoist Rack And Pinion VFC Motor Control Lifting Speed 0–60 M/Min

Price Negotiable
Price: Negotiate
MOQ: 1 set
Delivery Time: 25-30 days
Brand: KANGBO
Product Description

Building site hoist rack and pinion SC200BG MP-B09 SC200/200BG MP-B10

 

Design


It is the truly modular rack and pinion hoist design, so the elevator drive devices and cars are generic and interchangeable.
The modular and standardizing system makes the Kangbo construction elevators be flexible, efficient, safe, productive, low energy consumptive and ownership cost, making them the best choice for both construction and rental companies.

 

Production and Materials


KANGBO implements the true modular design of rack and pinion hoists, standardization and fine finishing of lifts parts and spare parts, and assembly line production. The material elevator components are versatile and universal.
Main structure frame are made of 16Mn and Q345 high strength cold roll steel plate, cut by laser, process by CNC machines in tool fixtures, welded by robots.
The construction lift cage roof is made by a full steel plate, and the edges are totally welded, to ensure no water leakage and high strength.

 

Configuration


There is a small crane for conenient assembly of the construction lift.
There is the additional 'C' door at cage side for convenient loading/unloading.
Available in single or twin hoist cage configuration.
The construction rack and pinion elevators are Variable Frequency Drive (VFD), with low starting current and much less wear and tear, very smooth starting and stopping.
Manual or Automatic Controls of the hoist is optional.
Lighting inside construction elevator car is LED ceiling lamp
The construction material hoist cage roof doors are equipped with Interlock.
Equipped with hoist drop test facility with remote control.

 

Technical Data

Item & Article No. SC200BG, MP-B09; SC200/200BG, MP-B10
Payload Capacity 2,000 KG per Cage
Lifting Speed 0–60 m/min.
Max. Lifting Height 250/400 m*
Cage Width (Internal) 1.5 m
Cage Length (Internal) 3.2 m
Cage Height (Internal) 2.35 m
Cage Doors 3 Doors, Entry Door + Exit Door + Side Door
Motor Control FC (Frequency Control)
Engine Power 2x23 KW per Cage
Gearbox Helical Gearbox
Safety Device Type Centrifugal Brake
Power Supply Range 380–500 V, 50 or 60 Hz, 3 Phase
Mast Section Square Column 650*650*1508 mm with Bolted Rack
Rack module 8
* Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xiamen Comwinning Imp.&Exp.Co.,Ltd
Location Rm. 704, No. 30, Binglang Dongli, Siming District, Xiamen, China
Contact Person Chen Junjie

Request A Quote

Please check your email address.
Your message must be at least 20 characters.