Share Group Limited
                                                                                                           
Verified Supplier
43 Years
Since 1983
Menu

GDI Injector Repair Kit Split Ring, 12.1mm OD X 6.5mm ID X 2mm THK, For VW Audi GM Saturn Nissan Hyundai

Price Negotiable
Price: $0.08 for 500 pcs, $0.07 for 5,000 pcs, $0.06 for 10, 000 pcs
MOQ: 500 PCS
Delivery Time: Normally 5 Days
Brand: SHARE FILTERS
Product Description

 
GDI Injector Repair Kit Split Ring, 12.1mm OD x 6.5mm ID x 2mm THK, for VW Audi GM Saturn Nissan Hyundai
 


 

 
Why SHARE
 
SHARE produce a wide range of mesh-insert plastic molded filters for various automotive applications:
Oil filters
Gasoline filters
Injector filters
ABS filters
Automobile air conditioner filters
Transmission filters
Brake filters
Power steering filters
Oil control panel filters
Gas Cap Breather Filters
Reservoir Filters
SCR Urea Systems filters
Solenoid valve filters
Steering filters
 
Call or email us for more information and support about our specific customized molded plastic filters for automotive applications.
SHARE application specialists with decades of years experiences will help you select the best solution for your application.
 
 
Packaging & Shipping

1. Packed into sealed PE bags, 10pcs to 500pcs/bag according to the actual size
2. Put into b
igger PE bag and then standard export carton
3. W
rapped the outer carton with PE stretch film to prevent damage during transportation
4.
Package belt strengthen if pallets are available


The label contains the following standard information:
item name, manufacturer, material, dimensions, manufacturing date, order number, batch number etc.

 Port to PortDoor to Door
Express(DHL,UPS,FEDEX, EMS) 1 - 5 days
Air Freight1 - 5 days4 - 10 days
Sea Freight(FCL)15 - 30 days20 - 35 days
Sea Freight(LCL)15 - 30 days22 - 37 days

 

FAQ

 
1. Where is your factory located? How can I visit there?
We are in Taizhou city, Zhejiang province China. By train, we are one hour away from Hangzhou and two hours away from Shanghai.

2. Can I get free samples and how long can you deliver them?
We are pleased to provide you with free samples for your evaluation, which will be sent to you within 2 days. Please feel free to reach out to us for samples.


3. How long does a quotation take?
In most cases, we respond within 2 days. If something in RFQ need be confirmed, we will promptly notify you soon.
4. How quickly can I get my order finished?
The production lead time is dependent on the quantity. Typically, it takes 5 to 15 working days for us to complete mass production once you have placed the order.
5. What about your quality control?
By visual inspection, optical or pressure sensitive equipment and automated 3D image-inspection equipment, our production operators conduct self-inspections at every stage of the process. Additionally, we have spot inspections and final inspections carried out by our Quality Control (QC) team.


6. What's your largest advantage?
One of our core competencies is our excellent converting capabilities from yarn over weaving to converted items with professional technical team and quality guarantee and management for more than 30 years.

7. What kind of payment terms do you accept?
T/T and LC and more.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Share Group Limited
Location Pingqiao Industrial Park, Tiantai County, ZJ, 317203, CHINA.
Contact Person Eric Xiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.