YHZS60 Mobile Concrete Batching Plant 60m3/H Ready Mix Concrete Batching Plant
Mobile concrete batching plant YHZS60 60m3/h ready mix concrete batching plant
Product introduction of mobile concrete batching plant:
Concrete plants can be portable, stationary or semi-portable. Typical concrete mixing plants are used for the production of finished mixtures, concrete recycling, civil infrastructure, marine works, prefabricated structures, etc.
Main features of mobile concrete batching plant:
1. Simple structure, easy to install and maintain.
2. Using advanced components, electrical and operating parts.
3. Fully automatic and easy to operate.
4. Efficiency is 30% to 40% higher than average
5. Low energy consumption and low noise.
6. Fully automatic operation: high metering accuracy and labor saving.
7. Demountable prefabricated structure: flexible layout, easy installation and disassembly.
8. Cleaning function of mixing system: easy to clean and maintain.
9. Electric pulse dust collector: large dust removal area.
Parameters of mobile concrete batching plant:
| Model | YHZS50 | YHZS75 | YHZS100 | YHZS150 | |
| power(m³/h) | 40 | 54 | 72 | 120 | |
| mixer(twins piral/twin blade) | model | JS1000 | JS1500 | JS2000 | JS3000 |
| Discharge volume(L) | 1000 | 1500 | 2000 | 3000 | |
| aggregate particle size(mm) | ≤60 | ≤80 | |||
| Batching station (semi-siloed) | bin volume(m³) | 10×4 | 10×4 | 15×4 | |
| lnclined belt conveyor band width | B800 | B800 | B1000 | ||
| csale range and accuracy | stone scale(kg) | (600-2000)±2% | (900-3000)±2% | (1200-4000)±2% | (2000-6000)±2% |
| sand scale(kg) | |||||
| cement scale(kg) | (180-600)±1% | (270-900)±1% | (360-1200)±1% | (600-1800)±1% | |
| water scale(kg) | (90-300)±1% | (150-500)±1% | (150-500)±1% | (250-800)±1% | |
| liquid admixture scale(kg) | (15-50)±1% | ||||
| unloading height(m) | 4 | 4.1 | |||
Our services:
Installation
1.Need 2 engineers for installation.
2.Customer pay engineers’ subsidy 80USD per person per day.
3.Customers bear engineers’ Visa application fees and round-trip tickets; food and accommodation,
4.The seller supplies the Foundation Map, Electrical Map, Manual
5.Installation usually takes 30 working days (but also depends on local manpower and material resources).