Machinery Building Material Machinery Other Construction Material Making Machinery

380Volt PU Sandwich Shutter Door Roll Forming Machine Making Machine 22Kw

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: 30 Working Days
Brand: CANGZHOU FMS
Product Description

PU Sandwich Shutter Door Roll Forming Machine Making Machine Manufactures Prices

 

  Put the steel coil on the un-coiler----Feeding guide equipment----Roll-forming Machine----Foaming machine ----Adjusting device ----Punching device----Flying saw cutting-----finished products on stacker

 

   This foaming aluminum shutter forming machine integrates cold roll forming technology and PU foaming technology into one, thuscontinuous automation production of foaming roller shutter door is achieved.

PU Sandwich Shutter Door Roll Forming Machine

  1. Rolling up and down, the noise is smaller, the work is quieter, which means less damage to the door every day, longer working hours, and more suitable for human care in some crowded areas.

  2. PU shutter doors and windows are sound absorbing materials, so once you shake the shutter door, most of the street sound will be absorbed by the foam in the shutter door.

  3. Fireproof and energy saving: The foam density is large, which can save area energy and fire. Therefore, it is highly recommended to install the main door and window in a safer and more economical room.

 

Specification

Warranty of core components
1 Year
Voltage
380V 50Hz
Weight
9000kg
Production Capacity
5-8m/min
Power
22Kw
Dimension(L*W*H)
20*1*1.2m
Applicable Material
UPVC, Aluminum
Production Capacity
8-15M/Min
Voltage
380V.50HZ.3Phase
Weight
9000 kg
Roll material
45# high grade steel
Cutting blade material
Cr 12 high grade steel
Frame material
300 H-high grade steel
Core Components
Motor, PLC
Roll stations
18 rows
Rolling thinckness
0.3-0.8mm
Dimension(L*W*H)
20*1*12m

 

Guarantee

 

 

  1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

  2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

 

  40% in advance as down payment

  60% is paid before the shipment is processed

 

Delivery

 

  FOB: Tianjin Xingang Port

  The Delivery Time: 30 days after the down payment is received.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Famous International Trading Co., Ltd
Location ROOM 703, Yihe Building, Cangzhou City, Hebei province,China
Contact Person Ryan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.