Water 70mm CE Down Pipe Roll Forming Machine / Production Line

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: 30 Working Days
Brand: CANGZHOU Famous
Product Description

Water Down Pipe Roll Forming Machine Downpipe Making Production Line

Downpipe Making Production Line down Pipe Roll Forming Machine,whole line consist manual decoiler,main forming machine,control box,hydraulic pump and run out table


1.The whole line working speed is about 10m/min.,max working speed could be 15 meters per minute.
2.Feeding material width should be confirmed before machine design .the width are changeable,
3.Material thickness normal range are 0.3-0.8mm.if you have any special request on material thickness,we should discuss in advance .
4.Both three and four waves are suitable for the line.we can design the machine based on buyer's profile drawing
5.Final sheet embossing is avaliable.we can different embossing rollers on various pattern and drawings.
6.Pre-cutting are provided as you want.

.
 
Specification
uitable Material Material GI, PPGI, PPGL
Width 300mm
Thickness 0.3-0.8 mm
Material of rollers 45#, surface hard chromium plating
Rows of rollers 16 stations
Material of shafts High grade 45# forged steel
Diameter of shafts 70 mm
Material of cutting blade Cr12 Heat Treatment
Speed 10-15m/min
Side plate thickness 18 mm
Main power 5.5 kw
Voltage 380V 50HZ 3Phase
Appearance size (About) 4000mm*1000mm*1500mm
Weight(About) 5.8 tons


Guarantee 

 

1.Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

 

40% in advance as down payment

60% is paid before the shipment is processed

 

Delivery

 

FOB: Tianjin Xingang Port

The Delivery Time: 30 days after the down payment is received.
 
 
 
 
 
 

 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Famous International Trading Co., Ltd
Location ROOM 703, Yihe Building, Cangzhou City, Hebei province,China
Contact Person Ryan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.