Automatic Cosmetic Cellophane Machine 0.75KW Power 3D Packing
Automatic Cosmetic Cellophane Machine 0.75KW Power 3D Packing
Product Application
The machine is widely applicable to the automatic film packaging (with gold tear tape) of various single boxed articles. With new-type of double safeguard, no need stop of machine, other spare parts will not be damaged when the machine runs out of step. Original unilateral hand swing device to prevent shaking the machine adversely, and the non-rotation of the handwheel when the machine keep running to secure the security of the operator. No need to adjust the height of worktops at both sides of the machine when you need to replace mould, no need to assemble or dismantle the material discharge chains and discharge hopper.
Technical Parameters
|
Packing Material
|
Film and Gold Tear Tape
|
|
Model
|
DS-300A
|
|
Packing Speed
|
40 - 80 packs/min
|
|
Packing Size
|
L(25~240)*W(15~120)*H(8~60)mm
|
|
Electric Supply
|
220V 50Hz 5KW
|
|
Weight
|
500KG
|
|
Overall Dimensions
|
(L)2000 * (W)700 * (H)1400mm
|
Main Features
1) No need to regulate the height of two work tops of the machine when the mould need to be replaced, no need to assemble or dismantle the material discharge chains and discharge hopper. Reduce the replacement time of the mould four hours to the present 30 minutes.
2) New-type double safeguard mechanisms are used, hence other spare parts will not be damaged when the machine runs out of step without stop of the machine.
3) Original unilateral hand swing device to prevent the machine shaking adversely, and the non-rotation of the hand wheel during the running of the machine can secure the security of the operator.
4) New-type double-rotary film cutter can ensure no need to mill the blade during many-year use of the machine, which overcomes the defect that the traditional stationary single-rotary film cutting cutter was easily worn.
Payment
1.T/T and Western Union are accepted
2.30% deposit before production and 70% balance before shipment
3.All banking charges outside China are on buyers
Shipping
1.Upon receipt of payment , delivery date will be in 15-30 working days,
2.By Air, by Sea or by Express (DHL etc)
3.Shipment cost will depend on the destination, shipment way and the weight of the goods
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
