Shandong Langnai Metal Product Co.,Ltd
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Square 10x10mm 304 316 Polished Stainless Steel Pipe 19 Feet Length

Price Negotiable
Price: $2.25/KG
MOQ: 2 tons
Delivery Time: 7-30 working day
Brand: Tisco Bao steel
Product Description

Square Size 10*10 Mm 304 316 Polished Stainless Steel Pipe Tube 19feet Length

 

1.304 316 Stainless Steel polished  Square Tube information

 

Description
Product Name Stainless steel square pipe tube
Applications Construction, decoration, industry, food grade, etc
Model 304 316
Size 0.5-2mm thickness 
MOQ 2 Tons
Sample Price The Sample For Free
Payment 30% in advance and 70% before shipment or BL at sight

 

2. Stainless Steel polished Tube Chemical composition

 

Grade C Si Mn P S Ni Cr Mo
201 ≤0 .15 ≤0 .75 5. 5-7. 5 ≤0.06 ≤ 0.03 3.5 -5.5 16 .0 -18.0 -
202 ≤0 .15 ≤l.0 7.5-10.0 ≤0.06 ≤ 0.03 4.0-6.0 17.0-19.0 -
301 ≤0 .15 ≤l.0 ≤2.0 ≤0.045 ≤ 0.03 6.0-8.0 16.0-18.0 -
302 ≤0 .15 ≤1.0 ≤2.0 ≤0.035 ≤ 0.03 8.0-10.0 17.0-19.0 -
304 ≤0 .0.08 ≤1.0 ≤2.0 ≤0.045 ≤ 0.03 8.0-10.5 18.0-20.0 -
304L ≤0.03 ≤1.0 ≤2.0 ≤0.035 ≤ 0.03 9.0-13.0 18.0-20.0 -
309S ≤0.08 ≤1.0 ≤2.0 ≤0.045 ≤ 0.03 12.0-15.0 22.0-24.0 -
310S ≤0.08 ≤1.5 ≤2.0 ≤0.035 ≤ 0.03 19.0-22.0 24.0-26.0  
316 ≤0.08 ≤1.0 ≤2.0 ≤0.045 ≤ 0.03 10.0-14.0 16.0-18.0

2.0-

3.0

316L ≤0 .03 ≤1.0 ≤2.0 ≤0.045 ≤ 0.03 12.0 - 15.0 16 .0 -1 8.0

2.0 -

3.0

321 ≤ 0 .08 ≤1.0 ≤2.0 ≤0.035 ≤ 0.03 9.0 - 13 .0 17.0 -1 9.0 -

 

 

3. Stainless Steel polished Tube ​Classification

 

Stainless steel tube can be divided into round tube and profiled tube according to the shape of cross

section.The special-shaped tube has rectangular tube, diamond tube, elliptic tube, hexagon tube, octagon

tube and various section asymmetrical tube and so on.

 

4.Stainless Steel polished Tube Product picture

 

 

 

5. Packing

 

Packing Concrete Steps:

1. pipes covered with wooden plate for protection in transportation.
2. All pipes will be loaded in strong wooden packages.
3. Every cartons loaded with good shoring and strengthening.
4. Take container loading pictures and seal the container.

 

6. More information

 

MOQ 1 TON
Price term FOB/CIF /CFR
Payment term T/T,L/C(30% deposit byT/T and 70% payment before delivery)
Delivery time 5-10 days,Based on stock and order quantity

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Langnai Metal Product Co.,Ltd
Location Huitong Steel Logistics Park, Dongchangfu District, Liaocheng City, Shandong Province
Contact Person Ella

Request A Quote

Please check your email address.
Your message must be at least 20 characters.