High Performance Pipe Expander Machine Each Row 60 Holes Long Service Life
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
60-80days
Brand:
OEM/ODM
Product Description
High Performance Pipe Expander Machine Each Row 60 Holes Long Service Life
Vertical Expansion Machine Specification
| Item | Specification | |||||
| Model | ZZL-850 | ZZL-1200 | ZZL-1600 | ZZL-2000 | ZZL-2500 | ZZL-3000 |
| Max Length of Tube Expander | 200-850 | 200-1200 | 200-1600 | 250-2000 | 300-2500 | 300-3000 |
| Pipe Diameter | φ5,φ7,φ7.4,φ9.52 | |||||
| Wall Thickness | 0.25-0.45 | |||||
| Pitch-row×Pitch | Adaptive Configuration | |||||
| Max Number of Tube Expander | 8 | |||||
| Max number of holes in each row | 60 | |||||
| Fin Hole Diameter | The Customer Provides | |||||
| Fin holes arrangement | Plover or Parallel | |||||
| The diameter of the tube expanding cylinder | φ150,φ180,φ200,φ220 | |||||
| Total Power | 7.5,15,22 | |||||
| Hydraulic Pressure | ≤14Mpa | |||||
| Expending speed | About 5.5m/min | |||||
| Voltage | AC380V,50HZ, 3 phase 5 wire system | |||||
| Remarks | Specifications can be modified according to customer’s requirements | |||||
product detail
high performance pipe expander machine
Detection device
Packing Details
The machine is packed in plywood cases which can be moved through forklift by its feet.
The nearest sea port is Shanghai port which is the largest and most convenient port over China.
The delivery time is 60 days after receipt of down payment.
The machine can be loaded into normal container (20GP or 40GP).
Delivery Details
45-120 days after approval of your
specification and receipt of your payment for new clients.
- Port: Shanghai
- Lead Time :
-
Quantity(Sets)
1 - 1
>1
Est. Time(days)
60
To be negotiated
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Changzhou Aidear Refrigeration Technology Co., Ltd.
Location
Wujin High and New Technology Development Industry ,Changzhou ,Jiangsu,China
Contact Person
Michael



