HJ AUTOMATIC CONTROL TECHNOLOGY CO., LTD
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Alternating Salt Spray Lab Auto Parts Test Equipment 0.05~0.17MPa

Price Negotiable
Price: Negotiatable
MOQ: 1 Set
Delivery Time: 40 days
Brand: HeJin
Product Description

Alternating salt spray laboratory Auto Parts Test Equipment 0.050.17MPa

 

Products Introduction:

It is mainly used for the salt spray corrosion resistance of automobile power battery pack, automobile assembly and parts; It can simulate marine climate and assess the salt spray corrosion resistance of automobile assembly and parts and their protective layer.

 

Parameters:

2.1 Studio size The 250025003000mm (W D H) can be ordered
2.2 Outline dimension Approximately 320036004200 mm (W D H)
2.3 Temperature range Normal Temperature ~ + 70℃ (Adjustable)
2.4 Temperature fluctuation ±0.5℃
2.5 Temperature departure ±2℃
2.6 Lift temperature time

Heat up: 5℃ / min

Cool down: 0.5℃ / min

2.7 Humidity range 20%~98%R.H
2.8 Humidity deviation

±3%R.H(>75%R.H)

±5%R.H(≤75%R.H)

2.9 Salt fog settling amount 1~3ml/(h.80cm2) Adjustable (16-h average)
2.10 Test time 0~999 H, M, and S (Adjustable)
2.11 Spray method Intermittence, continuity
2.12 Salt fog test process

① spray salt spray at 15 to + 35℃ for 2h,

② temperature (40 ± 2) ℃, relative humidity (93 ± 3)%, placed for 20 to 22 h;

③ temperature (23 ± 2) ℃, relative humidity of 45% to 55%, placed for 3 days.

Stage① and stage② are one cycle, repeating 4 cycles and then proceed stage③ to form a test cycle and completing 4 test cycles at the test.

2.13 Meet a criteria

Lithium-Ion Power Battery Pack and Systems for GB / T 31467.3-2015 Electric Vehicles-Part 3: Safety Performance Requirements and Test Methods (Salt Spray Test)

GB / T 2423.17-2012 (salt fog test)

GB / T 2423.18-2012 (salt fog test)

2.14 Salt fog test process

① spray salt spray at 15 to + 35℃ for 2h,

② temperature (40 ± 2) ℃, relative humidity (93 ± 3)%, placed for 20 to 22 h;

③ temperature (23 ± 2) ℃, relative humidity of 45% to 55%, placed for 3 days.

Stage and stage are one cycle, repeating 4 cycles after the cycle to form a test cycle and completing 4 test cycles at the test.

2.15 Supply source Voltage AC 380V± 10%, 50Hz ± 5%, three-phase four-wire system + grounding wire

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company HJ AUTOMATIC CONTROL TECHNOLOGY CO., LTD
Location No.6-36, Yaogu Farm, Shibi No.3 Village, Shibi Street, Panyu District, Guangzhou, Guangdong, China
Contact Person Tessa Huang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.