Guangzhou Luhu Traffic Facilites Co., Ltd.
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

Hydraulic Double Tank Thermoplastic Road Marking Machine

Price Negotiable
Price: Negotiable
MOQ: 1PC
Delivery Time: 5-20 working days
Brand: ATM
Product Description

Hydraulic 12HP Double Tank 650KG Road Marking Thermoplastic Paint Preheater Machine for Melting Paint                    

 

PRODUCT DESCRIPTION 

 

ATM-650

 

Application:Heat and Melt Thermoplastic Road Marking Paint
Type:Double-cylinder
Engine:12HP Diesel Engine
Weight:1000kg
Dimension(L*W*H):1500*1600*1750mm
Material:Stainess Steel
Heat Method:Liquefied Gas
Tank Capacity:325 kg*2 (Two Tanks)
Driving Method:Hydraulic Transmission
Features: 1.Meet Customers' Need of High Cost-Effective
2.Save Cost of Heat
3.Great Heat Preservation
4.No Rust and Fade
5.Long Validity and Easy to Maintain

 

DIFFERENT MODELS

              ATM-650                                      ATM-900                                               ATM-1500

 

 

DETAILS

 

 

 

CONSTRUCTION

 

Operating procedures
 
1. Preparation
Check diesel engine oil, cooling water, diesel, etc. Connect the industrial control valve with the gas pipe, and connect the pressure reducing valve with the gas bottle at one end and with the gas pipeline (7) at the other end, and then check the stove control valve(12) (should be closed), then open the gas bottle valve, and ignite the ignition rod (9). Open the viewing window (11), place the ignition rod (9) in the viewing window to align the stove, ignite the stove by opening the stove control valve (12).
 
 
2.Heating
 
When starting to melt the paint, heat it with a small fire and put a small amount of paint, and start the diesel engine when it starts to melt. After the speed of the diesel engine stabilizes, start the agitator to operate the reversing valve handle (3) [turn clockwise inward, stop in the middle, and counterclockwise outward]. At the same time, continue to put new materials into the kettle, increase the amount of fire and strengthen stirring, until the paint in the kettle is completely melted, and the temperature reaches 180 ℃-200℃ can be placed in the construction equipment for marking construction. Every day the construction materials should be planned, and do not leave too much paint in the kettle at the end of the construction. If there is more paint left, it should be released, cooled and solidified and crushed, and it will be used with the new paint in the next construction. But to avoid too much repeated heating.
 
 
 

COMPANY PROFILE

 

 

Founded in 2008, GZ LUHU TRAFFIC FACILITIES CO., LTD., whose factory is located in Guangzhou City, Guangdong Province, is a large-scale professional manufacturer specializing in the R&D, sales and engineering installation of traffic facilities.

 

Main Business Scope: traffic facilities, traffic signs, lighting equipment, metal products, plastic products research, processing, manufacturing, sales, exports of goods and technology; construction of traffic signs, benchmarking installation projects, installation of parking facilities , traffic marking line project. Now there are many line marking teams with rich experience. The annual marking line construction volume reaches 1 million square meters.

 

Main Products: large-scale traffic safety signs and benchmarks, gantry frames, municipal fences, road safety fences, small signs for parking lots, marking paints, marking equipment, convex mirrors, locators, corner guards, speed bumps, traffic cones, traffic barriers, traffic lights and road studs, etc..

 

Since its establishment, GZ LUHU TRAFFIC FACILITIES CO., LTD. has insisted in strict project management, the pursuit of excellence, thus achieving 100% of engineering qualification and 100% of the contract fulfillment, which has been widely recognized in the industry. Besides, the company has successively participated in a number of national and provincial key projects.

 

 

CERTIFICATE

 

CLIENTS

 

 

FAQ

 

 

What is payment term?

We accept Cash, TT, and Paypal.

 

 

How long will you prepare goods?

We have enough stock for most products and can arrange shipment within 3 days upon receiving your payment. For customized goods, it will take about 7 working days, subject to actual situation.

 

 

What kind of shipping method is provided?

We can provide EXW, FOB, CIF service, etc.. If part of your order from other suppliers, you can let suppliers delivery goods to our factory and we can load goods to the container in our factory, free of charge.

 

 

CONTACT US

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Luhu Traffic Facilites Co., Ltd.
Location ROOM#01 ,Floor 3A , Block C,HUIJIN SQUARE .NORTH BAIYUN ROAD .,BAI YUN DISTRICT, GUANGZHOU ,GUANGDONG ,CHINA
Contact Person allen fang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.