Shenzhen AMT Technology Co., Ltd.
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu

Rechargeable Li-ion Battery Cell 705060PL-2700mAh 3.7V for Lighting Products,with UL/UN38.3/CE/IEC62133 certificates

Price Negotiable
Price: Negotiate
MOQ: 1000pcs
Delivery Time: 2~4weeks for samples,4~6 weeks for mass production
Brand: ODM/OEM
Product Description

 

Production Description:

1.Basic Parameter

2.Advantage of polymer lithium battery:

   Flexible size,large capacity rang,customizable

   Durable cycle life

   Stable quality,high safety

3.Safety Characteristics

Items Criteria Test Method
Over-charge No fire. No explosion. Charging to 6V with Maximum Charging Current after Standard Discharge, then CV Charge till current decline to End-of-Charge Current or CV time is more than 7hours.
Short-Circuit The maximum Temperature: ≤150℃. No fire. No explosion. Rest for 30miniutes at (55±2)℃ after Standard Charge, then short-circuit battery by connecting the positive and negative terminals with a circuit load having a resistance load(copper wire) of 80±20mΩ.Test can be terminated when battery surface temperature has returned to ±10°C of environment temperature.
Thermal Abuse No fire. No explosion.

The battery is to be heated in a gravity convection or circulating air oven after Standard Charge. The temperature of the oven is to be raised at a rate of 5±2℃per minute to a temperature of 130 ±2°C and

remain for 10 minutes.

 
4.Reliability Characteristics

Items Criteria Test Method
Static Humidity and Temperature Retention Capacity:≥80%×CR Recoverable Capacity ≥85% ×CR No deformation. No rupture. No smoke. No leakage After Standard Charge, the battery is stored at 40±2℃ and 90% -95%RH for 48hours, then rest for 2hours at 23±2 ℃ . Standard Discharge to test its retention capacity, and then perform a cycle with Standard Charge and Standard Discharge procedure to test recoverable capacity
Vibration OCV≥3.6V No leakage. No fire. No explosion After Standard Charge, the battery is fixed to vibration table and subjected to vibration cycling that the frequency is to be varied at the rate of 1Hz per minute between 10Hz and 55Hz, the excursion of the vibration is 1.6mm. The battery shall be vibrated for 30 minutes per axis of XYZ axes.
Drop OCV≥3.6V No leakage. No fire. No explosion. After Standard Charge, the battery is to be dropped from a height of 1 meter onto concrete board for 6 times, then measure Open Circuit Voltage.

 
5.Charging-Discharging Temperature and Voltage, Current diagram
6.Application
 

 7.Production Equipment


8.Our Service:

   Customizations:dimension,capacity,protection board ,etc.

   Quick Response:you requirements will be replied wihthin 12hours.

   OEM are accepted.

   Warranty: 13 months rarranty of products and goods after-sale service offered.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen AMT Technology Co., Ltd.
Location Room 14F,Building A2,Zhujiang Plaza,Longxiang Road,Longgang District,Shenzhen,Guangdong,China
Contact Person Sales Manager

Request A Quote

Please check your email address.
Your message must be at least 20 characters.