Excavator swing reduction PC160-7 21K-26-B7100 excavator swing gearbox
Excavator swing reduction PC160-7 21K-26-B7100 excavator swing gearbox
Product Description
|
Appliion |
Excavator |
|
Part name |
Travel reduction gearbox |
|
Model |
PC160-7 |
|
Part number |
|
|
MOQ |
1PC |
|
Warranty |
6 months/12months |
|
Payment term |
T/T, PayPal |
|
Delivery |
1 day after the payment received |
|
Shipment |
by sea, by air, by express, or as required |
List of Spare Parts
| Pos. | Part No | Qty | Parts name |
|---|---|---|---|
| 21K-26-B7100 | [1] | SWING MACHINERY Komatsu China | |
| ["SN: B20001-UP"] |1. | |||
| 21K-26-B7130 | [1] | OUTPUT ASSEMBLY Komatsu China | |
| ["SN: B20001-UP"] |1. | |||
| 1. | 21K-26-B7010 | [1] | PINON SHAFT Komatsu China |
| ["SN: B20001-UP"] | |||
| 2. | 21K-26-B7020 | [1] | SPACER Komatsu China |
| ["SN: B20001-UP"] | |||
| 3. | 21K-26-B7030 | [1] | SEALING Komatsu China |
| ["SN: B20001-UP"] | |||
| 4. | 21K-26-B7040 | [1] | COVER Komatsu China |
| ["SN: B20001-UP"] | |||
| 5. | 21K-26-B7050 | [1] | BEARING Komatsu China |
| ["SN: B20001-UP"] | |||
| 6. | 21K-26-B7060 | [1] | GEAR BOX HOUSING Komatsu China |
| ["SN: B20001-UP"] | |||
| 7. | 21K-26-B7070 | [1] | SEAL RING Komatsu China |
| ["SN: B20001-UP"] | |||
| 8. | 21K-26-B7080 | [1] | BEARING Komatsu China |
| ["SN: B20001-UP"] | |||
| 9. | 21K-26-B7090 | [1] | NUT Komatsu China |
| ["SN: B20001-UP"] | |||
| 10. | 21K-26-B7110 | [1] | PLUG Komatsu China |
| ["SN: B20001-UP"] | |||
| 11. | 21K-26-B7120 | [6] | SCREW Komatsu China |
| ["SN: B20001-UP"] | |||
| 12. | 21K-26-B7140 | [1] | PLUG Komatsu China |
| ["SN: B20001-UP"] | |||
| 13. | 21K-26-B7150 | [1] | LUBRIION KIT Komatsu China |
| ["SN: B20001-UP"] | |||
| 14. | 21K-26-B7160 | [3] | O-RING Komatsu China |
| ["SN: B20001-UP"] | |||
| 15. | 21K-26-B7170 | [1] | GEAR Komatsu China |
| ["SN: B20001-UP"] | |||
| 16. | 21K-26-B7180 | [1] | REDUCTION ASSEMBLY Komatsu China |
| ["SN: B20001-UP"] | |||
| 17. | 21K-26-B7190 | [1] | GEAR Komatsu China |
| ["SN: B20001-UP"] | |||
| 18. | 21K-26-B7210 | [1] | O-RING Komatsu China |
| ["SN: B20001-UP"] | |||
| 19. | 21K-26-B7220 | [1] | GEAR Komatsu China |
| ["SN: B20001-UP"] | |||
| 20. | 21K-26-B7230 | [1] | REDUCTION ASSEMBLY Komatsu China |
| ["SN: B20001-UP"] | |||
| 21. | 21K-26-B7240 | [1] | GEAR Komatsu China |
| ["SN: B20001-UP"] | |||
| 22. | 21K-26-B7250 | [1] | RING, SNAP Komatsu China |
| ["SN: B20001-UP"] | |||
| 23. | 21K-26-B7300 | [1] | HYDRAULIC MOTOR (SEE FIG.Y1260-05A0) Komatsu China |
| ["SN: B20001-UP"] | |||
| 24. | 21K-26-B7270 | [16] | SCREW Komatsu China |
| ["SN: B20001-UP"] | |||
| 25. | 21K-26-B7280 | [1] | LUBRIION KIT Komatsu China |
| ["SN: B20001-UP"] | |||
| 26. | 21K-26-B7290 | [1] | LUBRIION KIT Komatsu China |
| ["SN: B20001-UP"] | |||
2. The gear parts are supplied strictly according to the genuine parts alog.
3. All the gear components are manufactured from carefully selected materials with standard quality using standard production process heat treatment processes — including case carburizing, nitriding, and induction hardening.
4. Surplus stock and the various varieties of gear parts that cover final and swing drive.
Company Description
- Loed in Guangzhou China, GZ Belparts Engineering Machinery Co., Ltd was founded in September 2013. Now, we have one shop, one warehouse, and one office as well as a professional team for purchasing, selling, packing, shipping, and after-sale service.
- > Self - improvement
- We will always remain active and positive to be self-improvement with great effort.
- > Integrity
- Belparts holds a belief: have faith in ourselves, have confidence in others. We are faithful and honest to everyone, and to all of our partners.
- > Innovation
- Belparts is committed to bringing in new methods to create innovation in its production.
- > Share
- Belparts is a team, we share difficulties and achievements.
Delivery&Logistics
- Packaging Details:
- 1.According to orders, pack the spare parts one by one by oil paper;
- 2.Put them into small carton boxes one by one;
- 3.Put the packed small carton boxes into bigger carton boxes one by one;
- 4.Put the bigger carton boxes into wooden boxes if necessary especially for the shipments by sea.
- 5. Goods is packed with oil paper and plastic bags inside
- 6.Using wooden case package.
- 7.We support the custom-made demand for package
Factory
Processing&Testing
Semifinished Articles
Hot Products
FAQ
-
Q: When will you ship my order?
-
A: Once we get confirmation of payment, we will try our best to ship orders within 24 hours.
-
Q: Which shipping term you can supply?
-
A: By sea, air, or by express ( DHL, FedEx, TNT, UPS, EMS)
-
Q: How long does it take to my address?
-
A: The Normal delivery time is 1-7 days, depending on which country you are in.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.










