Anping Changfeng filter material factory
                                                                                                           
Verified Supplier
30 Years
Since 1996
Menu

Two Component Solvent Based Pu Adhesive Plastic Bucket Packaged

Price Negotiable
Price: Negotiable
MOQ: 5 / Tons
Delivery Time: 8-10 work days
Brand: Chang Feng
Product Description

AB Polyurethane Two-Component Adhesive Glue 6/1 And 5/1 Hydraulic Oil Filter Glue For Filter

 

1. Product introduction

 

Two-component polyurethane adhesive for machine

component proportion ratio is 100:25

 

2. Parameter table

 

 

Two-component polyurethane adhesive for machine

component proportion ratio is 100:25

  Material-A Material-B
Weight Small barrel :25KG 6.25KG
  Big barrel :50KG 12.5KG
Physical nature orange-red viscous liquid (color based on your request to configure) brown-yellow liquid
viscosity 800-1000MPa.S(25°C) 25-50MPa.S(25°C)
density 1.02g/ml 1.02g/ml
package Plastic bucket or Tin bucket Plastic bucket ,Tin bucket, Plastic pots
storage 1. Material-A and material-B can store up 3-6 months.
  2. To appropriate indoor storage above 15°C

 

3.Production process

 

1. Material-A should stirred evenly with plastic hand electric drill, material-B can shake, before used.

2. Open the electrocaloric plate temperature to 40-50 degrees, in winter material-A and material-B with a small container to preheat.

3. Wipe the mould with release agent

4. Each 1kg A add 3-6g water, also according to the local environment, such as the humidity in the air, workshop environment.

5. material-A and material-B are mixed at the mixture ratio of 100:40 ratio, then add 40% talcum powder(heavy calcium powder)(100:40:50±5), with 2800 rev / min motor to mix, mixing time determined by the amount of adhesive, per 100g of adhesive is approximately 7-10 seconds .

6. Pour the Mixed liquid into mould, then put the paper element and give a little pressure on it. 8-15 minutes later you can bring the mould down.

 

4. Method of operation

 

1.The material must be full rocked after each to the plastic injection machine plastic injection so that the A material mixing evenly.

1.Everytime the plastic injection machine plastic injection A material must be full before the shaking in order to the material until

2.AB material proportioning ratio of A:B=100:25 or 4:1.28°C,you can start operation

3.Material temperature controlled 24°C-28°C appropriate then you can start operation.

4. Must be clean before using the mould release agent (Note:

The new plastic mould can be wiped free)

5 .If A and B is not reaction please measuring A and B ratio.

6. A and B must be sealed to .To avoid the air and water vapor reaction, as a result affecting the effect of colloidal

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Anping Changfeng filter material factory
Location Changfeng Filter Element Material Factory, No. 5, Filter Material City, Anping County, Hengshui City, Hebei Province, China
Contact Person Daisy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.