CE Highway Guardrail Roll Forming Machine 10T Leveling Punching
Price:
Negotiable
MOQ:
one set
Delivery Time:
25-50 work days
Brand:
Gracias
Product Description
CE Highway Guardrail Roll Forming Machine 10T Leveling Punching
Direction for use
Two or three waves highway guardrail roll forming machine:
1. Put all necessary parts on the right location,make the ground falttening.
2. Connect electric wires,use 6-8 mm² support line and keep grounding.
3. Fill hydraulic oil in the pump.not too full,three quarters are ok.
4. Feed raw materil into the machine slowly,make it run smoothly then automatic.
5. Pay attention to final sheet collection,do not scretch it or hurts people.
Size Chart of This Design
| Item | Decoiler | Machine | Control box | Pimp | Run out table |
| Width | 1.2m | 1.8m | 0.5m | 1.2m | 1m |
| Length | 1.6m | 12m | 1.1m | 1.4m | 3m |
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
WENZHOU YIHENG MACHINERY CO.,LTD
Location
R2236 LUGANG DASHA LUCHENG ZONE WENZHOU CITY, ZHEJIANG CHINA.
Contact Person
Sisi Zhang

