GUANGZHOU TECHWAY MACHINERY CORPORATION
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Twin Mast SC800 Building Site Hoist , 8Ton High Rise Material Hoist

Price Negotiable
Price: 18,800USD~80,000 USD per Unit
MOQ: 1Unit
Delivery Time: 40 Days after advance payment
Brand: TW-TECHWAY
Product Description

8Ton SC800 Big cage twin mast hoist /Material hoist with Frequency Inverter for High Rise Buildings

 

Technical features:

 

SC800G double mast construction lifts

 

1. double guide rail structure, elevator adopts frequency conversion control and runs smoothly.

2. special speed limiting device, synchronize and stop both ends of a speed limiter.

3. super large cage for large and heavy cargo.

 

Specifications:

 

Model SC800
Loading capacity 8000KG/cage
Rated speed 0-30m/min
Motor & Gear Box 2x3x11kw  Chinese brand 
Inverter 2x37kw      Chinese brand
Mast section size 650*650*1508mm
Cage size 6*4*3.2m (customized)
Safety device SAJ70-1.4 (with braking system)
Hot galvanize parts Mast section/trolley
Optional  

 

Case Show:

 

TW-TECHWAY Construction Elevator is the Top Sales Brand in China, with CE certificate.

Thanks to our continuous investment & innovation, we had successfully built the most advanced construction elevator/building hoist production facility in China! The first fully-automated production line equipped with the latest A.I technology in the country.Every year we are supplying more than 6000 units of building hoists/construction elevators to the whold world.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company GUANGZHOU TECHWAY MACHINERY CORPORATION
Location Room 1311, Building NO.3 Golson Plaza, NO.163 Yingbin Ave,Huadu District, Guangzhou, 510800,China
Contact Person Zhang Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.