Electronic Plastic Plastic Injection Mold Parts / Mobile Phone Case Cover SPI Surface
Plastic Mobile Phone Shell Case Cover Electronic Plastic Parts Injection Mold
Mold details
| Product name | Plastic Mobile Phone Shell Case Cover Electronic Plastic Parts Injection Mold |
| Mold shaping | Plastic Injection molding |
| Mold base | LKM, HASCO, DME, etc |
| Mold material | NAK20, S136, P20, 718H, 738H, 45#,etc |
| Mold cavity | Single or Multiple |
| Tolerance | +/-0.005mm |
| Finish | Anodized, Polish, Silk-screen, Painting, etc. |
| Sprue gate | Hot,cold runner, pin-point gate,etc |
| Design software | UG, PROE, CAD, SOLIDWORK, etc. |
| Product material | ABS, PP, PE, POM, PMMA, etc |
| Mold life | 100k-500k shots |
| Lead time | 25-45 days |
| Transportation | By sea, by air or by land as you request |
| Package | Standard or as you request |
| OEM/ODM | Acceptable |
| Certificate | ISO9001: 2008, SGS, IATF 16949 |
Company Information
ShenZhen Johnhalm PDTec., Ltd and Shenzhen KaHeng Mould Manufacturer is a global manufacturer of both conventional and multi-slide die cast precision components. We offer solutions for a variety of industries including light of hoticulture and ballast, professional/stage lighting housings, LED light enclosures, motors, communication products, consumer electronics, automotive, healthcare, and more.
All of our customers receive insight and expertise throughout all stages of the project. Contact us to request a quote today.
Test Equipment
Package And Transport
Production Information
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex,moldflow report will be present as well.
4. In house mold making shop ensure you mold quality under well control.
5. Normally it takes 25-35 days to make mold,precise time depends on part design.
Normal Molding
FAQ
1. How can I get the quotation?
Please send us the drawing, quantity, weight and material of the product.
2. What kind of file can you read?
PDF, IGS, DWG, STEP,etc...
3. What is your way of packing?
Normally we pack goods according to customers' requirement.
For reference: wrapping paper, carton box, wooden case, pallet.
4. When can I get the samples and your main order time?
For samples: 25-35 days after start to make mold.
For order:30 days, the accurate time depends on product.
5. What's your payment term?
1) Tooling cost 50% deposit and 50% after T1 samples approved.
2) Parts cost Net30
3) Payment Method: Wire
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


