Guangzhou C.Y. Machinery Parts Trading Co., Ltd.
                                                                                                           
Verified Supplier
27 Years
Since 1999
Menu

M2X150 Swing Motor Gearbox Assy Swing Assy Excavator For DH258

Price Negotiable
Price: Negotiable
MOQ: 1 PCS
Delivery Time: 1-7 Days for stock items, 10-25 days for production order
Brand: HKT FUP
Product Description

M2X150 Swing Motor Gearbox Assy Swing Assy Excavator For DH258

 

1. Products Description

 

Part No: M2X150
Model No: DH258
Parts Name: Excavator Travel Motor
Dimensions: Frame install holes: 12, Sprocket install holes: 12
Lead Time: 3 Days
Package: Wooden Box
Place of Origin China (Mainland)
Port: Guangzhou Or As Request
Delivery Methods: DHL / FedEx / TNT / UPS / Air Shipping / Sea Shipping
Payment Methods: Bank / Western Union / Paypal

 

3. Excavator Travel Reducer:

 

  E305 E305 TRAVEL REDUCER TRAVEL GEARBOX
  E320B E320B 114-1484 TRAVEL GEARBOX
  E320C 148-4695 TRAVEL GEARBOX
  E320D 227-6035
2966298
TRAVEL GEARBOX
  E320D 353-0611 TRAVEL GEARBOX
  E322C 227-6133 TRAVEL GEARBOX
  E324E 333-2907 TRAVEL GEARBOX
  E325BL 114-1357 TRAVEL GEARBOX

 

 

 

FAQ

 

 

Q. Which countries have you exported?

ASIA: Iraq, UAE, Turkey, Thailand, Malaysia, Indonesia, Vietnam, Bangladesh, Kuwait, Lebanon

EUROPE: Russia, Kazakhstan, Greece, Norway, Ireland

OCEANIA: Australia, Fiji, Kiribati, New Caledonia

AMERICAS: Canada, Jamaica, Brazil, Peru, Chile,

AFRICA: Angola, South Africa, Kenya, Tanzania, Zambia, Sudan, South Sudan, Egypt, Algeri, Nigeria

 

Q: How can I get a quotation?
A: A complete quotation based on the details as follows in your inquiry:
1. Part No. 2.Engine model 3.Machinery model 4. Description and size

Picture. 6.. Quantity 6. Other requirements, such as Packing, Shipping and so on.

 

Q: 4. When can you deliver after sending deposit?
It depends on your order quantity, if we have stock then need about 3~10 working days get it ready, if no stock we will start to produce when the deposite received. Usually it takes 15-60 days for different items.


Q: How do you pack the goods?
We have 20 years experience on export, finished products will be carefully handled by three steps:
1: Wrapped with packing paper or plastic bag;
2: HKT / FUP box or neutral box;
3: Put in an appropriate carton box or wooden boxes and be fixed firmly.

 

Q: How can I know the status of my order?
We will keep you udpate the process of the preparation, to ensure all issues are resolved prior to the delivery.products pictures can be provided if required. We shall send out the goods immediately after confirmation and you will get the tracking information right away

 

Q: How to guarantee your service?

A. Strict inspection during production

B. Strictly check the products before shipment to ensure our packaging in good condition

C. Track and receive feedback from customer regularly

 

Q: What will you do for quality complaint ?

A. We will respond to customer within 24 hours.

B. Our QC will retest the same stock item, if confirmed it is quality problem, we will make corresponding compensation

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou C.Y. Machinery Parts Trading Co., Ltd.
Location Room 408. Junyi Business Building, No.1025 Zhongshan Road Tianhe District, Guangzhou 510660, China
Contact Person Sheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.