CMM Finishing Milled Aluminium Parts ISO2768M Passivation Alodine
Special Finishing Milled Aluminium Parts Custom Machined Parts Custom Aluminum Parts
Product Description
We XinBo Precision has been engaged producing and supplying all kinds of CNC Milling parts over 10 years. Our main customer mainly come from North America and Europe in the Robotics, chemical, equipment, automation filed. We have sufficient experience on reading and understand the print in English, German.
In the past 10 years we’ve build up experienced engineering team, quality team; We review the drawing carefully, don’t accept the order if we can’t meet the print requirement, we don’t ship out the parts if the parts failed to meet the customer’s requirements.
| Name | Custom Manufacturing Service, CNC Turning Parts. |
| Materials | Aluminum, Copper, brass, stainless steel, steel, iron, zinc etc. Other Special Materials: PTFE/Nylon/POM/Titanium//PEEK, etc. |
| Surface Treatment | Anodizing, Hard Anodizing, Brushing, Galvanized, Laser Engraving, Silk printing, Polishing, Powder Coating, Passivation, Alodine, Barrel Grinding, Trommelen, Chemical Conversion, Bead Blasting, Satin Finish, Chrome Plating etc. |
| Tolerance | ISO2768m, ISO2768f, 0.005mm. |
| Testing equipment | CMM; Tool Microscope; Automatic Height Gauge; Manual Height gauge; Dial Gauge; Screw Gauge; Plug Gauge; Micrometer; Marble Platform; Roughness Measurement |
| Processing | CNC Turning, CNC milling, CNC machining, Grinding, EDM Wire Cutting, Sink EDM |
| File Formats | Solid Works, Pro/Engineer, AutoCAD(DXF,DWG), IGS,STP, PDF,TIF etc. |
| Service Project | Free Design Review(DFM report), Production And Technical Service. |
| Roughness | Ra0.4, Ra0.8, Ra1.6,Ra3.2, As machined. |
Machining Equipment
| Name | Module | Range | Brand | Origin | Qty. | Precision |
| CNC Milling | VMC850/VMC1270 | V500-1270mm | Baoming/Baojia/Weikun | China | 26 | 0.02mm |
| CNC Milling | 4 axis | 200mm | BangBang | China | 5 | 0.005mm |
| CNC Milling | 5 axis | 200mm | BangBang | China | 1 | 0.005mm |
| CNC Milling | S500X1 | 500*400*300 | Brother | Japan | 2 | 0.005mm |
| Automatic Lathe | MC7036B/MC7020XE | 1-100mm | ZhongTai | China | 8 | 0.01mm |
| CNC Lathe | VT-17L | 215*470mm | Alex-Tech | Taiwan | 1 | 0.002mm |
| Turn-mill Combination | B0203-III | 1-46mm | TSGAMI | Japan | 4 | 0.002mm |
| Surface Grinder | PSGC-4080 AHR | 400*800mm | Proth | Taiwan | 2 | 0.002mm |
| Grinder | 520 | 200*400mm | Taizheng | China | 6 | 0.005mm |
| Mill Machine | 3# | 200*1000mm | Jietongda | China | 8 | 0.02mm |
| High Speed Wire Cut | 200*500mm | Jicheng | China | 4 | 0.02mm | |
| Medium Speed Wire Cut | DK7732C-C | 320*400mm | Baoma | China | 4 | 0.01mm |
| Laser Engrave Machine | G20 | Cherrywoolf | China | 1 | ||
| Other equipment:Drill machine, Tapper, Polisher, EDM puncher, Ultrasonic cleaner, Sand blaster machine, Saw machine, Magnetic grinder. | ||||||
Inspection Equipment
| Name | Module | Measuring range | Brand | Origin | Qty. | Precision |
| Height gauge | Hite-400 | 0-400mm | TESA | Swiss | 4 | 0.003um |
| Projector | VMS-3020 | 0-400mm | Video | Japan | 2 | 0.003um |
| CMM | CROMA 564 | 500*600*400mm | SERERN | Joint venture | 2 | 0.003um |
| Hardness tester | HR-150C | 20-88HRA,20-100HRB,20-70HRC | Rockwell | China | 2 | 0.5HRC |
| Film thickness gauge | AR932 | 0-1700um | Smartsensor | China | 2 | |
FAQ
Hong long is the shipping, and what’s the shipping cost?
The parts can be shipped out by your FedEx, DHL, or UPS account or by our DHL account. 4-7 working days to the USA and Europe.
The parts also can be shipped out by your or my courier, normally it’s 20%-50% cheaper than DHL but takes 3-5 days longer.
Why the prototype is so expensive?
There are many reasons caused the the prototype price is high:
- To make one prototype it always has to prepare 2 or 3 materials, it depends on how difficult the module is.
- The time and cost for CNC programing the prototype have to be shared with one part instead of hundreds of parts.
- If the part have to be have the second operation(for example bead blast, anodize), the shipping cost have to be shared with only only one part.
- It’s time consuming to set up the machine, and it’s time consuming to make the fixture, it takes couples hours to make the first part, when the programming and process is proofed workable, the second and the third parts takes much less time on machining.
- Sometimes, it’s unavoidable to make mistake in programming and the process of set up the machine, the risk has to be taken into consideration.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
