E330 6Y2756 Excavator Track Link Shoe Excavator Track Shoe 600MM
E330 6Y2756 Excavator Shoe Track Link Shoe Excavator Track shoe
| Product Name | Track shoe for E330 E340 |
| Product Information | Excavator track shoe |
| Material | 25MN |
| Length | 600 mm |
| Thickness | 11 mm |
| Colors | Black |
| Application | Excavator E330 E340 LG936 |
| Weight | 21.9 kgs a track shoe |
| Warranty time | 6 Months |
| Certification | ISO9001 |
| MOQ | 10 pieces |
| Delivery Time | Within 20 days after contract established |
| Package | NO BOX,track shoes will be packed by wooden pallet or wooden case. |
Packing
►Plastic bag ►Brown carton ►White sack ►2 pcs White sticker ►Plastic belt ►Wooden pallet
| TRACK BOLT & NUT | ||
| 8H7504 | 6S3419 | 1/2" x 1-1/2 |
| 4K7038 | 7K2017 | 9/16 x 1-5/8" |
| 7H3596 | 7K2017 | 9/16"x 1.15/16(D4) |
| 7H3598 | 1S1860 | 3/4"-16unf x 2.13/32(D7) |
| 6V1792 | 1S1860 | 3/4"x2-7/16"(SQ,D6H) |
| 1S1859 | 1S1860 | 3/4"x2-5/32" |
| 7H3597 | 1M1408 | 5/8"x 2-3/32"(D5) |
| 9G3110 | 1M1408 | 5/8"x 2.17" |
| 7H3599 | 2S2140 | 7/8"x2-21/32" |
| 7T2748 | 7G6442 | 7/8"x3-11/32" |
| 6V1723 | 7G6442 | 7/8"x3-13/32"(D8N) |
| 2M5657 | 1S6421 | 1"x2-15/16"(D9) |
| 6T2638 | 7G0343 | 1" x 3.35/64(D9N) |
| 6V1726 | 7G0343 | 1 '' x 3.3/16 (D9L) |
| 7T1000 | 5P8221 | 1-1/8"x3-25/32" |
| 5P3868 | 5P8221 | 1-1/8" x 4.13/32(D10N) |
| 6T8853 | 3T6292 | 1-3/8 x 4.30" (D11R/N) |
| 9W3619 | 9W3361 | track bolt-M20*55 |
| 6Y0846 | 9W3361 | M20*63(CAT 325) |
| 6Y9024 | 9W4381 | M22 *67 (CAT 330) |
| 1504741 | 1504742 | M24*67 (CAT345B) |
| 6Y7432 | 6Y7433 | M27*90 (CAT375) |
Who we are ?
Quanzhou Hesen Machinery Industry CO., LTD.,One of 17-years experienced industry and trade company. Bolts & Nuts,Track Links And Track Shoes are our main items. We already built business relationship with most of countries, including Malaysia, India, Thailand, Indonesia,Russia and so on.
Why choose us
- 17 years old experienced manufacturer and trader in Excavator spare parts business.
- 3 factories and 6 warehouse are located at Fujian and Guangzhou.We have a lot of stock for most of our items.and they are very near from the ports.
- All of our products are strictly produced according to ISO9001 system standard.
- We have our own design and develop department,thus,we can produce the spare parts according to your samples or drawings.
FAQ
What's your terms of packing?
Generally, for bulk shipments, we will pack the goods on sturdy fumigated wooden pallets. If you have a legally registered patent, we can pack the goods in your branded boxes after getting your official authorization letter.
What's your terms of payment?
You can pay by wire transfer,Western Union or other payment methods we have negotiated on. T/T 30% as deposit and 70% as final payment.
What's your terms of delivery?
Fully flexible logistics service to meet your needs.
Regularly, FOB, CNF,DDU, CIF terms are accepted if necessary.
How long would it take to receive the parcel?
Generally, RTS product can be delivered to its destination within 2-15 days. If production is required, we will deliver within our negotiated time after receiving your deposit payment. Time taking depending on the items and quantities you have ordered and also other force majeure.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.





