75kVA Single Phase Pad Mounted Transformer 12.47KV to 240V Oil-Immersed Outdoor Distribution

Price Negotiable
Price: $1000-$10000
MOQ: 1unit
Delivery Time: 30days
Brand: WINLEY
Product Description
Product Overview

75kVA oil-immersed single phase pad mounted transformer designed for outdoor electrical distribution applications. This transformer features a robust cabinet construction with security doors and locks, suitable for both loop and radial feed configurations.

Key Features
  • Single phase design with ratings from 15-250 kVA
  • Oil-insulated and self-cooled construction
  • Dead-front design for enhanced safety
  • Available in loop or radial feed configurations
  • Designed for outdoor installation in cabinet enclosures
75kVA single phase pad mounted transformer exterior view
Technical Specifications
Rated Capacity (kVA) High Voltage (V) Low Voltage (V) Connection Symbol Standard Short-circuit Impedance (%) Efficiency (%)
25 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 98.95
37.5 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.05
50 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.11
75 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.19
100 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.25
167 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.33
250 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.39
333 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.43
500 4160-34500 110-480 II0, II6 IEEE/ANSI/DOE 1.0-4.5% 99.49
75kVA transformer internal components and wiring
Available Accessories
Transformer accessories and components
  • 4 position loadbreak switch
  • Multiple voltages or taps configuration
  • Externally-operable multiple voltage or tap changer switches for safe operation
  • Stainless steel tank, tank bottom, sill, door, and/or hardware
  • Service entrance in sill
  • Various spades and terminals available for secondary bushings
  • High-voltage bushing inserts
  • Ground connectors
  • One piece high-voltage bushings
  • Envirotemp™ FR3™ fluid
  • Loadbreak switches
  • Drain/sampling valve
  • Pressure vacuum gauge
  • Liquid level gauge
  • Temperature gauge
Manufacturing Process
Transformer manufacturing process step 1 Transformer manufacturing process step 2 Transformer manufacturing process step 3 Transformer manufacturing process step 4
Frequently Asked Questions
Can I order a sample?

Yes, we welcome sample orders to test and verify product quality before larger purchases.

What is the production lead time?

Mass production typically requires 15-25 days from order confirmation.

What warranty do you provide?

We offer a 24-month warranty from B/L date. For accessory issues, we provide free service upon receiving photos of damaged components. We also supply easily damaged accessories and technical support as needed.

Do you offer OEM/ODM services?

Yes, as a manufacturer with our own R&D team, we provide comprehensive customization including color, special functions, packaging, logo printing, and custom designs based on your specifications.

How do you ensure product quality?

All products hold CE certification. We employ professional engineers and strict quality control throughout production, with performance testing at each stage and comprehensive final quality inspection.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xiamen Winley Electric Co.,Ltd
Location No. 99 Yilan Road,Siming,Xiamen,Fujian,China
Contact Person Steven

Request A Quote

Please check your email address.
Your message must be at least 20 characters.