Shenzhen Motoma Power Co., Ltd.
                                                                                                           
Verified Supplier
22 Years
Since 2004
Menu

Renewable Energy 48v 200ah LiFePO4 Battery 10KWh For Off Grid Solar Energy Systems

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 25-29 days
Brand: MOTOMA
Product Description

Renewable Energy 48V200Ah LiFePO4 Battery 10KWh Deep Cycle Solar Battery For Off-Grid Solar Energy Systems

LiFePO4 Battery Parameters

 

Battery model                                      LFP48V200Ah 
Nominal voltage                                            48V
Nominal capacity                                          200Ah
Minimum capacity                                          200Ah
Charging voltage                                       48V
Standard charging current                                      40A(0.2C)
End current                                      2A (0.01C)
Max. charging current                                     100A (0.5C)
Standard discharging current                                      4 A (0.2C)
Max. discharging current                                      200A (1C)
End voltage of discharge                                      54.75V
Dimension of cell                                     Customized 
Charging temperature range                                        0~45℃
Discharging temperature range                                       -20~60℃


 

LiFePO4 Battery Features

 

  • With SOC design.
  • Long cycle times: >4000 times
  • Support bluetooth & APP monitor.
  • Support high power discharge.
  • Smaller,lighter and longer life.

 

LiFePO4 Battery Advantage

 

  • With 30% size of lead acid batteries.
  • Low self-discharge batteries.
  • With intelligent protection, more safe.
  • more light weight, 30% weight of lead acid batteries.
  • Eco-friendly batteries.

 

LiFePO4 Battery Picture

 

 

 

 

FAQ

1. Q: Is there a MOQ limit?

    A: The MOQ is 1PC per order.

2. Q: What's the normal lead time?

    A: Normally it's 25-29 days, and if there is stock, the lead time would be much shorter.

3. Q: Can I get the samples for testing before place an order?

    A: Yes, 1-6pcs samples are available.

4. Q: What's your delivery time?

    A: 6-10 days for sample order, 25-30 days for bulk order

5. Q: Are you a battery factory?

    A: Yes, we're located in Shenzhen, China.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Motoma Power Co., Ltd.
Location 3/F,Bldg A,Zone 5,Zhongguan Honghualing Ind Park South,No.1213,Liuxian Ave,Nanshan, Shenzhen, China
Contact Person Heidi

Request A Quote

Please check your email address.
Your message must be at least 20 characters.