Guangzhou Tiangong Machinery Equipment Co., Ltd.
                                                                                                           
Verified Supplier
26 Years
Since 2000
Menu

Excavator Swing Motor for TGFQ SK200-6 Excavator Slewing Motor Reduction Assembly

Price Negotiable
Price: $200.00 - $746.00/pieces
MOQ: Negotiable
Delivery Time: Negotiable
Brand: TGFQ
Product Description
Excavator Swing Motor for TGFQ SK200-6 Excavator Slewing Motor Reduction Assembly
This high-performance swing motor assembly is specifically designed for TGFQ SK200-6 excavators, providing reliable slewing functionality and precise reduction gearing for optimal excavator operation.
Product Gallery
Excavator swing motor front view Excavator swing motor side view Excavator swing motor top view Excavator swing motor internal components Excavator swing motor installation diagram
Installation Precautions
  • Verify correct installation of piping and flexible hoses
  • Ensure proper motor rotation direction
  • Check for leaks from all motor components
  • Maintain operation within specified working temperature range
  • Monitor pressure within designated operating parameters
Troubleshooting Guidelines
  • For abnormal operation, evaluate all circuit elements affecting motor performance
  • Disassemble only in clean environments to prevent component loss or damage during reassembly
  • Handle precision hydraulic components with extreme care to avoid irreversible damage
Diagnosis & Maintenance
  • For unusual motor sounds: check case drain oil level, add oil if needed, and bleed trapped air from circuit
  • Inspect oil quality - replace if contaminated to extend motor lifespan
  • If issues persist, check work circuit pressure to determine if motor requires replacement
Our Company
Our company overview
Factory Facilities
Our manufacturing factory
Production Workshop
Our production workshop
Storage Warehouse
Our storage warehouse
Professional Team
Our professional team
Packing & Delivery
Packing Details: 1 set of Travel Reduction Gearbox per wooden box
Delivery Time: 3-7 days for shipment dispatch
Packing overview
Inner Packing: Plastic Film Wrap
Inner plastic film packing
Outer Packing: Carton
Outer carton packing
Outer Packing: Plywood Case
Plywood case packing
Truck Transport
Truck transportation
Sea Shipping
Sea shipping
Air Transport
Air transportation
Exhibition Showcase
Product exhibition display
Frequently Asked Questions
Q: Are you a trading company or manufacturer?
A: We are an industry and trade company
Q: How long is your delivery time?
A: 3-7 days for in-stock items
Q: What are your payment terms?
A: Payment ≤ $10,000 USD: 100% in advance
Payment ≥ $10,000 USD: 30% T/T in advance, balance before shipment
For additional questions, please contact us:
Contact information

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Tiangong Machinery Equipment Co., Ltd.
Location 8-109 No.1, West Da Sha Di Road, Whampoa District, Guangzhou, China
Contact Person jaming zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.