DX225 DX200A DX210W DX190W DX220A DX225LC DX230LC DX235NLC Oil Cooler K1008128
Price:
Negotiable
MOQ:
1 PCS
Delivery Time:
1-3 working days
Brand:
JGC
Product Description
DX225 DX200A DX210W DX190W DX220A DX225LC DX230LC DX235NLC Oil Cooler K1008128
Product description
Applicable Industries
Machinery Repair Shops, Manufacturing Plant, Construction works
Showroom Loion
None
Video outgoing-inspection
Not Available
Machinery Test Report
Not Available
Marketing Type
Ordinary Product
Place of Origin
Guangdong, China
Warranty
Unavailable
Condition
New
Brand Name
JGC
Appliion
Machine
Part name
Construction Machinery Parts
Model
Other
Type
Other
Product
Spare parts
Excavator
Excavator parts
Excavator parts
enigne parts
Condition
New, New
Quality
High quality,High Guarantee, Genuine
Usage
Cooling usage
This series of products is mainly used for hydraulic system circuit. When working, the high temperature oil flow in the hydraulic
system passes through the hydraulic oil cooling device, and carries out efficient heat exchange with the forced cold air flow in
the heat exchanger, so that the oil temperature is reduced to the working temperature to ensure that the host can continue to
operate normally, so that the work can be carried out smoothly.
system passes through the hydraulic oil cooling device, and carries out efficient heat exchange with the forced cold air flow in
the heat exchanger, so that the oil temperature is reduced to the working temperature to ensure that the host can continue to
operate normally, so that the work can be carried out smoothly.
FAQ
Q: How to guarantee the same?
A: Before sending, I will take pictures. After confirmation, I send.
Q: When to ship?
A: Once getting payment then arrange.
Q: Import customs fee?
A: It depends on import country. I can make lower valve so that you can pay lower customs fee even no need to pay.
Q: How long for transport?
A: For express/ air, it takes about 5 days. For land/ sea, it takes about one month. It depeds on your address.
Q: Product usage?
A: If any problem about usage, I will solve at first time.
A: It depends on import country. I can make lower valve so that you can pay lower customs fee even no need to pay.
Q: How long for transport?
A: For express/ air, it takes about 5 days. For land/ sea, it takes about one month. It depeds on your address.
Q: Product usage?
A: If any problem about usage, I will solve at first time.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jin Guan Chen Machinery Parts Business Department, Tianhe District, Guangzhou
Location
Shop 808, Building 8, No. 36, Zhuji Road, Tianhe District, Guangzhou
Contact Person
Liu
