Cold Mix Pothole Repair 25kg 20kgs In A Bag Patch Asphalt Mix Strong Adhension
Asphalt Patch in A Bag Asphalt Patch and Pothole Filler Asphalt Patch Products 20 Kgs
ZTA Asphalt Patch in A Bag is a kind of high-tech road patching material, mixed and prepared by using Zhongtian high-performance cold paving additive, asphalt and aggregate according to certain processing technology, with an appearance of black grain-like solid, slight petroleum smell, insoluble in water, insensitive to motive impact and static electricity, and with stable properties.
It is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, manhole adjustments.
| No. | Performance index | Technical requirements |
| 1 | Adhesive grade | 5 |
| 2 | Penetration strength (kg / cm2) | 0.5-4 |
| 3 | Stability (kN) | ≥3 |
| 4 | Residual stability (%) | ≥85 |
- Environmental protection: No smoke, no waste, no peculiar smell, no dust, the additive does not contain harmful substances, the material is insoluble in water, will not pollute the air, environment and groundwater, and is conducive to environmental protection.
- All-weather use.
- The construction is convenient, repair at any time, and take it at any time
- It is economical and affordable, and the remaining materials can be used without waste.
- Stable performance, resistant to storage
- Strong anti-aging performance, long service life of repaired pits
- Strong waterproof, can also be repaired in rainy days.
- The process is simple, no heating or stirring is required, and it can be opened to traffic after filling.
1 Pit cleaning
Clean up the gravel residue inside and around the pit to be repaired. No debris such as mud ice cubes can be left in the pit. Water in the pit does not affect the construction.
2 Brush interface agent
Brush the interface agent when necessary. For example: repair of cement pavement, repair of highway.
3 Fill the pit with cold fill
Fill enough pits into the pit (a 1m³ pit requires about 2.2 tons of cold fill) until the filler is about 1.5㎝ above the road surface. After filling, it’s better that the center of the pit is slightly higher than the surrounding road surface and is curved. If the pit depth is> 4㎝, the repair material should be filled and laminated layer by layer.
4 Compaction
After laying evenly, choose appropriate compaction tools and methods for compaction according to the size and depth of the repaired area and the actual environment. Such as car tire compaction, manual compaction, vibrating plate compaction compaction ad road compactor compaction. When repairing high-grade roads, the periphery and corners of the repaired area should be fully compacted. After the pits are compacted, the joints are closed with emulsified asphalt or joint tapes.
5 Open traffic
It can be opened to traffic immediately after compaction.
Asphalt Patch in A Bag Asphalt Patch and Pothole Filler Asphalt Patch Products 20 Kgs can be widely used in municipal roads, general roads, highways, parking lots, airport runways, tunnel damage of road asphalt concrete and cement concrete pavement, ruts, municipal road tunneling, repaired pavement, bridge expansion joints, heavy load pavement , repair and maintenance of road traffic and special road.


Approximate repairable area of 1 ton of material:
Repair depth Approximate repairable area
3cm 20㎡
5cm 15㎡
8cm 7.25㎡
10cm 8㎡
Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




